AH6 Robot Maintenance Manual
Document Version V1.1.2 (19/09/2022)
31
Figure 4-10 Installation of upper control cabinet interface panel
When installing the upper control cabinet interface panel, do not
clasp the cables or forcibly bend them to press in.
4.4
Removal and installation of base interface panel
Users can remove and install the base interface panel of AH6 Robot according to the
needs of use.
At the time of removal and installation, set up a safety fence and
warning signs around the robot to prevent other workers from
improperly operating it.