4.4
Installation Room
The Accumulator can be installed either in the boiler room or a neighbouring room.
Conditions in the installation room:
•
The access opening must be at least as large as the maximum unit dimension of
the Accumulator.
•
The ceiling height must at least correspond to the height of the Accumulator with
insulation (without ventilation).
•
The installation room must be frost-proof.
•
The floor of the installation room must be capable of bearing the whole weight of
the Accumulator after filling.
4 Requirements for an accumulator
11
Installation manual
Summary of Contents for 600
Page 1: ...Installation manual Accumulator 600 2000 liter ENGLISH PE590 EN...
Page 30: ......
Page 31: ......
Page 32: ......