4430 Planer
OLIVERMACHINERY.NET
19
|
Page
Receiving
Your shipment should come with one wood crate. Upon receiving your shipment, check for any significant
damages before signing the delivery confirmation.
CAUTION
You may need to remove the strapping that is used for securing your package.
Strapping may spring back violently when released and cause injury. Always wear
safety goggles and gloves for this task.
Moving Machine into the Shop
Your machine will be delivered by freight service, and it will be left outside of your workshop by default.
On the day of delivery, please be sure help is available to move the machine to its final location.
WARNING
4430 Planer has a gross weight of 625 lbs. and a net weight of 546 lbs.
Safe moving techniques and proper lifting equipment are required, or serious
personal injury may occur.
WARNING
Your shipment may be secured by the straps. Do not lift your shipment by the
strap. They are not designed to hold the total weight of your shipment. They may
snap without warning and cause serious injury and machine damage.
Unboxing
Upon removing the crate cover, you should find a planer that is mostly assembled, and three paper boxes
that contain all loose parts and accessories. Everything is covered by a plastic bag.
IMPORTANT
If items are damaged, please call us immediately at
1-800-559-5065
Summary of Contents for 4430.201 M-4430
Page 2: ......
Page 10: ...10 Page Oliver Machinery 4430 Planer Identification...
Page 11: ...4430 Planer OLIVERMACHINERY NET 11 Page...
Page 12: ...12 Page Oliver Machinery 4430 Planer...
Page 38: ...38 Page Oliver Machinery 4430 Planer Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6...
Page 50: ...50 Page Oliver Machinery 4430 Planer Wiring Diagram...
Page 51: ...4430 Planer OLIVERMACHINERY NET 51 Page Parts List Table Assembly...
Page 52: ...52 Page Oliver Machinery 4430 Planer Cabinet Assembly...
Page 53: ...4430 Planer OLIVERMACHINERY NET 53 Page Motor Mount Assembly...
Page 54: ...54 Page Oliver Machinery 4430 Planer Headstock Assembly...
Page 55: ...4430 Planer OLIVERMACHINERY NET 55 Page Gearbox Assembly Cover and Dust Hood Assembly...
Page 62: ...62 Page Oliver Machinery 4430 Planer Maintenance Record Date Task Operator...
Page 63: ...4430 Planer OLIVERMACHINERY NET 63 Page Notes...