22 |
Page
Oliver Machinery
4430 Planer
Cleaning
To prevent rusting, the cast iron bed and
extension tables of this planer are covered with
machine oil and plastic film. Remove the plastic
film, then wipe off the machine oil with paper
towels or rags.
Once all the machine oil is removed, routinely
coat the unpainted cast iron surface with rust
preventive such as Boeshield® T-9 or paste wax.
Do not use rust preventives that contain silicone,
which is known to interfere with certain finishes
and glues.
Assembly
This planer is mostly assembled in the factory. There are a few more items to set up before the machine
is ready for a test run:
1.
Install height adjustment handwheel.
2.
Install the dust hood.
3.
Install extension tables.
4.
Install the power switch.
5.
Connect planer to a dust collection system.
6.
Connect the planer to a power source.
The approximate time for cleaning and assembly is approximately 60 minutes.
Summary of Contents for 4430.201 M-4430
Page 2: ......
Page 10: ...10 Page Oliver Machinery 4430 Planer Identification...
Page 11: ...4430 Planer OLIVERMACHINERY NET 11 Page...
Page 12: ...12 Page Oliver Machinery 4430 Planer...
Page 38: ...38 Page Oliver Machinery 4430 Planer Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6...
Page 50: ...50 Page Oliver Machinery 4430 Planer Wiring Diagram...
Page 51: ...4430 Planer OLIVERMACHINERY NET 51 Page Parts List Table Assembly...
Page 52: ...52 Page Oliver Machinery 4430 Planer Cabinet Assembly...
Page 53: ...4430 Planer OLIVERMACHINERY NET 53 Page Motor Mount Assembly...
Page 54: ...54 Page Oliver Machinery 4430 Planer Headstock Assembly...
Page 55: ...4430 Planer OLIVERMACHINERY NET 55 Page Gearbox Assembly Cover and Dust Hood Assembly...
Page 62: ...62 Page Oliver Machinery 4430 Planer Maintenance Record Date Task Operator...
Page 63: ...4430 Planer OLIVERMACHINERY NET 63 Page Notes...