29
9.1 Fill Boiler With Water And Purge Air
Fill boiler with potable water.
•
Fill boiler and system piping with water (or antifreeze-
•
water solution, if used). See antifreeze information
page 11. Purge air from boiler using air vent. Purge
air from system piping.
Inspect system piping and boiler connections. Repair
•
any leaks immediately.
9.2 Fill Condensate Trap with Water
Disconnect collet clip from condensate hose barb. See
•
fi gure 9-1.
Disconnect tubing below from hose barb.
•
Pour approximately 2 cups (473 ml) of water into
•
condensate drain.
Reconnect tubing to hose barb with collet clip. See
•
fi gure 9-1.
9 - START UP PROCEDURE
9-1 Condensate Drain Assembly
1. Disconnect collet clip from
hose barb and fi ll Condensate
trap with water.
NOTICE
IMPORTANT: Condensate trap must be manually
fi lled with water at initial start up.
2. Reconnect hose to hose
barb with collet clip before
starting boiler.
Summary of Contents for OLSSC-075
Page 45: ...45 13 TROUBLE SHOOTING...
Page 52: ...52 14 WIRING DIAGRAM 14 1 Connection Diagram...
Page 53: ...53 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form...
Page 70: ...70 NOTES...
Page 71: ...71 Date Service Performed Company Name Tech Initials Company Address Phone...
Page 72: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13504 4729 web site www ecrinternational com...