Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 21
36.
Attach end
Soffit
Board flush to ends of outside
Rafters
with
2 - 1 1/4” screws
per
Rafter
end.
Complete both outside
Rafter/Soffit
connections first. Measure and position interior
Rafters
as illus-
trated above. When positioned correctly, attach
Soffits
to remaining
Rafters
with
2 - 1 1/4”
screws/rafter
.
Important:
Pilot Hole
Soffits
to prevent splitting.
Important:
Pilot
hole Soffit to prevent
splitting
37.
Complete second
Rafter
section following
Steps 34 - 36
.
20.5”
182”
45.5”
45.5”
45.5”
45.5”
20.5”
20.5”
20.5”
20.5”
20.5”
20.5”
20.5”
38.
With some helpers flip over each
Rafter
section so they can be lifted onto the shed.
Soffits
should now be on the ground.Prepare to lift onto Wall and
Gable Frame
Soffits facing the ground