Outdoor Living Today www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 15
B11.
Locate both
Door Headers - Short
(step facing up and out). Attach both short end pieces
using
2 - 2 1/2” Screws
per piece. Screw from top down into wall framing. Align to inside of wall
framing and tight against side wall.
Step to front
and top.
Align with
inside wall
framing.
B12.
Locate
Door Header - Long
(2” wide aluminum support attached already). Align step on
header facing up and out and with support strip to the inside of shed. Attach using
2 - 2 1/2” Screws
per end as shown above.
Hint:
Have 2 helpers push Side Walls together to close any gaps between
Headers. Complete both sides. Attach support strip to short headers with
2 - 3/4” Screws.
B13.
Locate both
Vertical Door Jambs
(1 1/2” x 3 1/2” x 73”) and position flush against front narrow
wall stud. The Jamb will sit flush to outside of wall siding
.
When positioned correctly, secure Jamb
using
6 - 2 1/2” Screws.
Complete both sides. With both door jambs secured, confirm 64” door
opening.
Push
Long Door Header has aluminum
support strip already attached.
3/4” screws
2 1/2” screws
Door opening
should be 64”