21.
With the Porch Rail Sections complete, attach
to the deck area as shown. Outer Deck Board will
be positioned flush with the Floor Frame in the front
corner. Fasten to Floor Joists with
4 - 2” Screws
.
Pre-drill pilot holes before fastening screws.
Complete other side the same.
View from
below
Flush with Side
Wall Framing
Thin part of Wall Trim/Support
covers siding on Front Wall.
Flush with Floor
Framing
PreDrill!
Hardware (Steps 21)
S3
- 2” Screws
x 8 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 16