Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 9
9.
Position Post R against Wall Framing as shown above. Make sure Post is flush with bottom of wall
framing. Locate Temporary Post/Wall Supports (3” high) and place underneath 2x4 edge and touching
2x3 as shown above. Clamp and attach Post to wall framing with 3 - 3” screws. Do both sides.
Temporary Post/
Wall Supports
(3” high x 2.5” wide)
Flush
Important:
Use a wood clamp to
temporarily hold Post
to Wall Framing.
2x4
10.
Complete 2nd Side Wall as per Step 9.
Temporary
Post/ Wall
Support.
11.
With a helper, carefully lift up completed
wall section and place between corner wall/post
sections. Align and attach as per
Step 9
. Be
mindful that corner Side Wall bottom framing is
flush with bottom of Side Vertical Post.