Hint:
Use a chalk line
to mark location of
floor joists to
determine screw
placement.
12 .
With Plywood
positioned correctly on
floor framing, attach
with 1 1/4” screws.
Use screws every 16”.
B. Wall Section
Exploded view of all parts necessary to complete
the Wall Section. Identify all parts prior to starting.
Window Wall
Panel (1)
Side Top Plates
(1 per side)
Angle cut on edge
Front and Rear Top
Plates (3 per side)
2 Angle cut on 1 end and 1
square cut.
Gable Walls (4)
(2/side)
Door Jambs
Narrow Wall Panels (2)
12” wide
Solid Wall
Panel (5)
Door Header
Bottom Wall Plate
13.
Starting with
Solid Wall Panels
, carefully lay panel face down. Position and attach
Wall
Plate
to bottom of wall studs of each wall panel with 6 - 2 1/2” screws. Position so plates are flush
with framing. Note, some Bottom Wall Plates may already attached to some Solid Walls.
Window Insert
(1)
Door Header
End Plates
(2)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 6