Outdoor Living Today www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 8
2.
When correctly positioned, attach each Joist with
4 - 2 1/2” screws
(2 per end).
You can find
the Square Drive Screw Bit in the Hardware Kit Bag.
3.
Lay out Floor Joist Frames as illustrated.
There are 3 larger and 3 smaller Frame Sections.
The Footprint for the floor when attached together
will be 136 1/2” wide x 96” deep.
5.
Complete all large and small frame
attachments. Screw each completed section
together with
8 - 2 1/2” Screws
.
Front of Shed
You can find the Square Drive Bit for the
screws in with the Hardware Kit Bag.
4.
Attach each Large and Small Floor Joist
Frame together with
6 - 2 1/2” Screws
per
section.
96”
136 1/2”
6.
When completed, your floor footprint should
be 136 1/2” wide x 96” deep.