Outdoor Living Today www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 9
7.
Attach
Front Floor Runners
to completed floor frame with notch
aligned flush with corner of floor framing and edge overhanging front
by 2”. The overhanging edge of the Front Floor Runners will be used
later to support the sliding door track. Attach with
6 - 2 1/2” Screws
per Runner.
Parts
Front Floor Runners
(1 1/2” x 5 1/2” x 68 3/16”)
x 2
Hardware
2 1/2” Screws
x 12 total
9.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution:
you will need 2 people to assist you. Be careful when laying floor down not to bend or twist
floor. When in place, level floor completely.
Note:
The floor will be flipped over
and the floor runners will sit on your
foundation. It is important to note that
having a level foundation is critical
.
Choosing a foundation will vary
between regions.
See page 3 of this assembly manual
for more information on foundations.
Foundations
8.
Attach
Floor Runners
to completed floor frame as shown
above. Make sure Runners are flush with side and rear of floor
framing but not overhanging. Use
6 - 2 1/2” Screws
per Runner.
Parts
Floor Runners
(1 1/2” x 3 1/2” x 68 3/16”)
x 8
Hardware
2 1/2” Screws
x 48 total
Concrete Slab
Foundation