3.
With Floor Joist Frames positioned together
flush, attach with
6 - 2 1/2” Screws.
4th Runner
96”
45 1/2”
5.
Align
Floor Runners - Long
(1 ½” x 3 ½” x 47 ¾”)
evenly spaced as shown above and flush with
the back of the Floor Frame. On the front, Runners will extend 2” past the Floor Frame to provide sup-
port for the Sliding Door Track later in the Assembly. Attach with
6 - 2 1/2” Screws
per Runner. Make
sure 4th Runner is placed equally over seam where floor frames meet.With Floor Runners attached,
carefully flip the floor over and place on your foundation. Caution - Be careful when laying floor down
not to bend or twist floor. Note: Having a level foundation is critical. Choosing a foundation will vary
between regions. Typical foundations can be concrete pads or patio stones positioned underneath the
floor runners.
6.
When in place, level floor completely
before proceeding.
7.
Position
Plywood Floor
pieces
(2) on top of
completed floor joists.
Flush with Floor Framing.
Front
4.
Position and attach
Floor Runners Short
(1 1/2” x 3 1/2” x 45 1/2”) on each side of the
completed floor frame with
6 - 2 1/2” Screws
per Runner. Make sure Runners are flush with
outside of floor framing but not overhanging.
Long Floor Runners overhanging Floor Frame on front
Floor Runners flush with Floor Frame on Back
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 8