16.
Position a Rear Wall into place on plywood floor. Butt both vertical wall
studs of Side and Rear Walls together and attach with
3 - 2 1/2” Screws
.
Screw at the bottom, middle and top of stud to secure properly.
Hardware (Steps 16 -18)
S1
- 2 1/2” Screws
x 18 total
17.
With the corner wall attachment complete, position a second Rear Wall panel in place so bottom
2x3 wall framing is sitting flush with outside floor joists and plywood floor. Wall siding should overhang
floor by approximately 1/2”. When positioned correctly, attach both Rear Wall panel studs together as
shown.
Do Not Attach Walls To
Floor Until Step 23.
Side W
all
Rear W
all
Optional
- Caulking
seams will help prevent
moisture from entering
your shed.
Caulking
not included in kit.
Rear W
all
Side W
all
Pilot Hole
first.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 13