background image

16.

 Position a Rear Wall into place on plywood floor. Butt both vertical wall 

studs of Side and Rear Walls together and attach with 

3 - 2 1/2” Screws

.  

Screw at the bottom, middle and top of stud to secure properly.

Hardware (Steps 16 -18) 

S1

 

- 2 1/2” Screws

 

x 18 total

17.

 With the corner wall attachment complete, position a second Rear Wall panel in place so bottom 

2x3 wall framing is sitting flush with outside floor joists and plywood floor.  Wall siding should overhang 
floor by approximately 1/2”.  When positioned correctly, attach both Rear Wall panel studs together as 
shown.

Do Not Attach Walls To 
Floor Until Step 23.

Side W

all

Rear W

all

Optional 

- Caulking 

seams will help prevent 
moisture from entering 
your shed.  

Caulking 

not included in kit.

Rear W

all

Side W

all

 

Pilot Hole 

first.

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        sales@outdoorlivingtoday.com

Page 13

Summary of Contents for SM812-FJ-Ply

Page 1: ... wet snowfall occurs it is advisable to sweep snow off roof frequently If the product is elevated any structural and building code requirements are solely the customer s responsibility and should be abided by In areas with high or gusty wind conditions it is advisable to install the structure securely to the ground Have a regular maintenance plan to ensure screws doors windows and parts are tightl...

Page 2: ...e on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can find the footprint for your shed on Page 3 of your Assembly Manual If doing the assembly yourself have all the necessary tools ready to go and in working condition A list of required tools can be found after the parts list One helper is recommended to assist in cons...

Page 3: ...d of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 2 1 Cubic Yards of gravel required approximatley 19 wheelbarrows 25 patio pavers 8 x 8 or larger Center patio paver stones underneath floor runners and underneath seams in floor joists Patio paver stones are widely available from mo...

Page 4: ...Roof Ridge Boards 18 1 1 2 x 3 1 2 x 56 1 2 Roof Rafters 4 1 2 x 4 1 2 x 68 1 4 Soffits 3 3 4 x 3 1 2 x 72 Roof Gussets angle cut on ends 4 3 4 x 1 1 2 x 48 Rafter Nailing Cleats Roof 4 5 8 x 48 x 72 Large Plywood Roof Panels 4 5 8 x 8 5 8 x 72 Small Plywood Roof Panels D Trim Miscellaneous Section Outer Wall Trim 10 1 2 x 4 1 2 x 45 1 4 Bottom Skirting Bevel 4 3 4 x 2 1 2 x 75 Filler Trim 6 1 2 x...

Page 5: ...30 Single Rafter Bracket x 6 Y31 Double Rafter Bracket x 4 Door Section 1 31 1 2 x 72 Left Side Door 1 31 1 2 x 72 Right Side Door 2 1 2 x 2 1 2 x 72 Interior Vertical Door Stops 1 1 2 x 2 1 2 x 68 Interior Top Horizontal Door Stop 1 3 4 x 2 1 2 x 62 1 2 Door Threshold 1 1 2 x 2 1 2 x 71 Interior Door Flange Miscellaneous 1 Metal Window Insert 1 Window Trim Pkg 1 24 1 16 angle cut 3 23 square cut ...

Page 6: ...h off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour Painting or staining your structure is highly recommended and will prolong the life of your shed You do not need to wait to paint or stain your shed the wood in your kit has been dried and can be stained or ...

Page 7: ... x 6 Floor Joist Frames Large 45 1 2 x 75 x 3 Floor Joist Frames Small 45 1 2 x 21 x 3 Hardware Steps 1 6 S1 2 1 2 Screws x 58 total A Floor Section Plywood Floor Large 3 Floor Joist Frames Large 3 Floor Runners 10 Plywood Floor Small 3 Concrete Pad optional foundation method Floor Joist Frames Small 3 Exploded view of all parts necessary to complete Floor Section Identify all parts prior to start...

Page 8: ...ll be 136 1 2 wide x 96 deep 5 Complete all large and small frame attachments Screw each completed section together with 8 2 1 2 Screws Front of Shed You can find the Square Drive Bit for the screws in with the Hardware Kit Bag 4 Attach each large and small floor joist frame together with 6 2 1 2 Screws per section 96 136 1 2 6 When completed your floor footprint should be 136 1 2 wide x 96 deep T...

Page 9: ...p the floor over and place on your foundation Caution you will need 2 people to assist you Be careful when laying floor down not to bend or twist floor When in place level floor completely Note The floor will be flipped over and the floor runners will sit on your foundation It is important to note that having a level foundation is critical Choosing a foundation will vary between regions Typical fo...

Page 10: ...ws Use screws every 16 push plywood together at seams Front Completed Floor configuration 11 Position all Large Small Plywood Floor pieces on top of completed floor joists The Plywood is cut slightly smaller than Floor framing Keep Plywood seams tight Parts Steps 11 12 Plywood Floor Large 45 3 8 x 74 7 8 x 3 Plywood Floor Small 45 3 8 x 20 7 8 x 3 Hardware Steps 11 12 S2 1 1 4 Screws x 70 total ap...

Page 11: ... Wall Panels 7 Door Header Long 1 Bottom Wall Plates 7 Door Headers Short 2 13 Lay out all the wall panels and become familiar with their location On Standard Kits there are 7 Solid Wall Panels and 2 Narrow Wall Panels and 1 Window Wall Panel Make sure to position panels right side up so water is directed away from and not into shed Look at window wall panel to compare and determine proper wall po...

Page 12: ... shed 2 x 3 w a l l f r a m e Flush with Floor Framing 1 2 overhang Important Make sure all walls are aligned in their upright position If not water may leak into your shed Unsure if panel is facing up or down Compare solid wall siding to window wall siding and match orientation 15 Starting at Rear Corner position a Solid Side Wall panel on top of Plywood Floor The Wall Panel bottom framing will s...

Page 13: ...el in place so bottom 2x3 wall framing is sitting flush with outside floor joists and plywood floor Wall siding should overhang floor by approximately 1 2 When positioned correctly attach both Rear Wall panel studs together as shown Do Not Attach Walls To Floor Until Step 23 Side Wall Rear Wall Optional Caulking seams will help prevent moisture from entering your shed Caulking not included in kit ...

Page 14: ...all attachments as per Steps 15 17 Pilot Hole first Pilot Hole first Pilot Hole first Front of Shed Side Wall Panel will sit flush with Floor framing at Front of Shed Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 14 ...

Page 15: ...ls Complete both sides Parts Vertical Door Jambs 1 1 2 x 3 3 8 x 73 x 2 Hardware S1 2 1 2 Screws x 8 total Flush to tip of Bevel Flush with Narrow Wall stud on inside 19 Position and attach both Narrow Walls as per Steps 15 18 Parts Narrow Walls 12 x 73 x 2 Hardware S1 2 1 2 Screws x 6 total Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 15 ...

Page 16: ...rt 2 x 3 3 8 x 6 1 2 x 2 Hardware S1 2 1 2 Screws x 4 total Notch to front and on top Pilot Hole first Pilot Hole first Notch to front and on top Pilot Hole first Sits flush with inside of Wall framing 22 Attach Long Door Header to Vertical Door Jambs and Narrow Walls with 2 2 1 2 Screws per side Position the notch on the top facing the front as per Step 21 Pre drill to prevent splitting Parts Doo...

Page 17: ...s are not within 1 4 your walls are not square Adjusting now will make it easier to install roof section Optional Caulking seams will help prevent moisture from entering your shed Caulking not included in kit 159 7 8 159 7 8 Angle screws into perimeter Floor Joists Pilot Hole first 6 4 24 Position Rear Top Plates on top of wall studs so they are flush on the inside Together the plates should be ce...

Page 18: ... fit Parts Triangular Gable Half Walls x 4 Hardware S1 2 1 2 Screws x 6 total 25 Next attach the Side Wall Top Plates The Side Wall Top Plates are angle cut down the length Once again position Top Plates on wall frame so they are flush Side Wall Top Plates will fit between Front Rear Plates Attach with 4 2 Screws per plate Complete all other Side Front Top Plate attachments the same Toll Free 1 88...

Page 19: ... an additional 6 Screws Screw from the bottom of Gable framing down into Top Wall Plate and Wall Framing Complete Gable positioning and attachment on the other side Hint Use a straight edge to check the angle of the Gable framing and Top Plate Both angles should line up see diagram above Hardware S3 2 Screws x 4 total Flashing overhangs on outside Use a straight edge to check that angle of Gable l...

Page 20: ...Ridge Boards the same Position metal Ridge Board Connector evenly on Ridge Boards Parts Ridge Boards Long 3 4 x 4 1 2 x 84 x 2 Ridge Boards Short 3 4 x 4 1 2 x 52 1 2 x 2 Hardware SS2 3 4 Screws x 16 total Y9 Ridge Board Connector x 2 total Metal Ridge Board Connectors 2 Rafter Brackets Double 4 Single 6 Soffits 4 Roof Gussets 3 Large Ridge Boards 2 84 long Roof Rafters 9 per side 18 total Large P...

Page 21: ...easure and position interior Rafters as illustrated below When positioned correctly attach Ridge Board to remaining Rafters with 2 2 Screws Rafter end 31 Attach end of a Soffit flush to ends of outside rafters with 2 1 1 4 Screws per Rafter end Drill pilot holes in Soffit to prevent splitting Complete both outside Rafter Soffit connec tions first Measure and position interior Rafters as illustrate...

Page 22: ...s Gable Notch Ridge Board Rafter 33 Slide Rafter Section up on gable framing until bottom of Ridge Board slips into gable notch Rafter should rest on gable framing Soffit Ridge Board 32 Flip Rafter Section over so Soffit is facing down Starting with one side lift completed Rafter Section up and place on gable framing Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com ...

Page 23: ...ace second completed Rafter Section on gable walls as per Steps 32 34 36 At the peak align Ridge Boards so they are flush together and secure them with 12 1 1 4 Screws Important If there is a gap between Ridge Boards have a helper push the Side Walls closer together from outside Walls should be 91 apart at top from inside of wall plate to opposite wall plate To completely secure Ridge Boards place...

Page 24: ...rews Repeat for each side of the rafter and then on opposite side of the roof Parts Rafter Nailing Cleat 3 4 x 1 1 2 x 48 x 4 Hardware S2 1 1 4 Screws x 12 total Lineup Rafter Nailing Cleat approximately 4 1 4 from end of rafter near soffit Lineup Rafter Nailing Cleat approximately 4 1 4 from end of rafter near ridge board 4 1 4 4 1 4 Important On each Rafter Nailing Cleat pre drill three pilot ho...

Page 25: ...crews 1 1 4 Screw 2 Screws 2 Screw 2 Screw 41 Attach all Single and Double Rafter Brackets where rafters meet Top Wall Plates inside of shed Attach with 2 1 1 4 Screws and 2 2 Screws per Single Rafter Bracket and 6 2 Screws per Double Rafter Bracket Have two helpers hold the Side Walls at the top from the outside of shed to keep the inside to inside measurement between the Top Plates at 91 Hardwar...

Page 26: ...x 48 x 72 x 4 Small Roof Panels 5 8 x 8 5 8 x 72 x 4 Hardware Steps 42 48 S2 1 1 4 Screws x 84 total Large plywood roof panels 2 side 5 8 x 48 x 72 4 Back approx 1 8 Plywood centered on 5th rafter 43 Plywood will overhang the front rafter by 4 On opposite side plywood will be centered 5th rafter still being supported by second rafter nailing cleat 44 With Roof Plywood correctly positioned on rafte...

Page 27: ...roof panels as per Step 44 46 Secure 5 8 x 8 1 2 x 72 Small Roof Panel on outside rafters with 8 1 1 4 screws Plywood will overhang outside rafter by 4 once again Place last roof plywood piece 5 8 x 48 x 72 on rafters 47 Secure with 12 1 1 4 screws Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 27 ...

Page 28: ...nels unprotected will result in water damage to the shed as well as delamination of the plywood Small gap 48 Repeat steps for opposite side of roof Secure left side Plywood Roof Panels as per Steps 42 47 Plywood panels can be positioned in a different pattern but the two large panels must meet on rafter with nailing cleats Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoda...

Page 29: ...plete the Miscellaneous Section Identify all parts prior to starting Filler Trim 4 Vertical Door Trim 2 Door Pull Handle Exterior Barrel Bolt Left and Right Doors Door Hinges 6 Facia Nailing Strips 4 Wide Corner Trim 4 Corner Trim 4 Front Horizontal Gable Trim 2 Window Trim Kit 1 Window Insert 1 Flower Box Kit 1 Bottom Skirting 10 Side Wall Vertical Door Narrow Trim 6 Horizontal Door Trim 1 Narrow...

Page 30: ...ting Bevel 1 2 x 4 1 2 x 45 1 4 x 10 Hardware N1 1 1 2 Finishing Nails x 40 total 50 Attach Filler Trim to each corner side wall Align Filler Trim so it sits flush with the bottom of the last piece of Wall siding Attach with 8 1 1 2 Finishing Nails per piece Parts Filler Trim 3 4 x 2 1 2 x 75 x 4 Hardware N1 1 1 2 Finishing Nails x 32 total front skirting Thicker at Butt side skirting Flush to bot...

Page 31: ...Wide Corner Trim with bottom of Corner Trim Corner Trim will cap the Wide Corner Trim Do a dry run in each corner before attaching to confirm positioning Use 8 1 1 2 Finishing Nails per piece to secure Complete other front corner the same Parts Steps 52 53 Corner Trim 1 2 x 3 1 2 x 79 x 4 Wide Corner Trim 1 2 x 5 1 2 x 82 x 4 Hardware Steps 52 53 N1 1 1 2 Finishing Nails x 64 total Corner Trim Wid...

Page 32: ...ard Use 5 1 1 2 Finishing Nails to secure each piece Parts Rear Horizontal Gable Trim Bevel 1 2 x 4 1 2 x 43 1 4 x 2 Hardware N1 1 1 2 Finishing Nails x 10 total 55 Position Drip Caps flush with each other with their midpoint centered on the Door Header Have a friend hold the Drip Caps in place before begin ning the next step Parts Metal Drip Caps x 2 Drip Cap rests in notch of Door Header Toll Fr...

Page 33: ...nels come together and leave a seam Position trim equally on wall seam and tight underneath Soffit and Rafter Use 8 1 1 2 Finishing Nails per piece to secure Parts Side Wall Narrow Trim 1 2 x 2 1 2 x 79 x 4 Hardware N1 1 1 2 Finishing Nails x 32 total Align with bottom of Horizontal Gable Trim 58 Attach Rear Wall Narrow Trim where wall seams come together on back of shed Position equally on wall s...

Page 34: ...ado notch comes together with protruding edge of Door Header 60 Attach Horizontal Narrow Wall Trim onto the exposed part of the Door Header and tight under the lip of the Drip Cap Secure Narrow Wall Trims with 2 1 1 2 Finishing Nails per piece Parts Horizontal Narrow Wall Trim 7 8 x 3 x 9 x 2 Dado Edge Hardware N1 1 1 2 Finishing Nails x 4 total Flush with Door Jamb Fit Door Trim tight underneath ...

Page 35: ...1 2 x 71 3 4 x 4 Hardware Steps 63 64 N1 1 1 2 Finishing Nails x 64 total Hardware S2 1 1 4 Screws x 12 total 61 Attach Horizontal Door Trim onto the exposed part of the Door Header and tight under the lip of the Drip Cap Secure Horizontal Door Trim with 5 1 1 2 Finishing Nails Parts Horizontal Door Trim 1 2 x 1 1 2 x 64 x 1 Hardware N1 1 1 2 Finishing Nails x 5 total 62 Attach Facia Nailing Strip...

Page 36: ...ates where Front Rear Facias meet at the peak Secure with 4 1 1 2 Finishing Nails per piece Attach Facia Detail Plates to cover seams where Side Facia pieces meet Secure with 4 1 1 2 Finishing Nails per piece Attach Horizontal Gable Detail Plates to cover seams where Horizontal Gable Trims meet Secure with 4 1 1 2 Finishing Nails per piece Parts Pentagon Facia Plates 1 2 x 5 1 2 x 8 x 2 Facia Deta...

Page 37: ...68 Left Side Door 31 1 2 x 72 x 1 Right Side Door 31 1 2 x 72 x 1 Hardware Steps 66 68 Y1 Tee Hinges x 6 total SB1 3 4 Black Screws x 6 total SB2 2 Black Screws x 30 total 67 Next position and secure the Double Doors Starting with Right Side Door position so there is a 1 2 gap on bottom and approximately 3 8 on the side Use a spare Shingle to shim door in place at the bottom Secure hinges to Door ...

Page 38: ... and Jambs Start with Horizontal Stop first and then complete both Vertical Stops Position so door gap is covered Use 4 2 Screws per piece to secure Parts Horizontal Door Stop 1 2 x 2 1 2 x 68 x 1 Vertical Door Stops 1 2 x 2 1 2 x 72 x 2 Hardware S3 2 Screws x 12 total 70 Close both doors and align so doors are straight Attach Door Threshold with 4 2 Screws centering between doorway Parts Door Thr...

Page 39: ...ck screws Hardware Y6 Cane Bolt x 1 total SB1 3 4 Black Screws x 6 total 73 Attach Door Handles and Exterior Black Barrel Bolt to door Attach Barrel Bolt as illustrated above with 5 2 Black Screws 1 3 4 Black Screw Note how female part of Barrel Bolt is positioned higher than male Do a dry run first to position Barrel Bolt correctly Attach each Door Handle with 4 3 4 Black Screws ensure screws con...

Page 40: ...ched caulk the triangular gap between the Insert s outside flange and the siding Also put a bead of caulking horizontally at top of window where the flange and siding meet This additional caulking will also will reduce the chances of moisture entering into your shed 76 Position Window Trim around window doing a dry run first and attach with 4 1 1 2 Finishing Nails per piece Window trim has a small...

Page 41: ...indow trim and secure with 2 2 Screws Screw from inside of box into the center Window Wall stud Attach second screw 2 underneath first screw and once again into the wall stud Parts Flower Box Kit x 1 Hardware S3 2 Screws x 2 total Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 41 ...

Page 42: ...aps 3 On a flat surface flip Flower Box on it s rear face Evenly space Brackets and secure through Base Frame and into the Brackets with 2 1 1 4 screws per Bracket Position completed Flower Box beneath window trim and screw from inside of box into the center wall stud with 2 2 screws 2 screws supplied with Base Kit Parts Lists A Base Rear Front Box Frames 3pcs 3 4 x 5 1 2 x 23 B End Cap Frames 2pc...

Page 43: ...y other proprietary notices contained on the materials No material may be modified edited or taken out of context such that its use creates a false or misleading statement or impression as to the positions statements or actions Canadian Address 9393 287th Street Maple Ridge British Columbia Canada V2W 1L1 United States Address P O Box 96 Sumas Washington USA 98295 Outdoor Living Today Please call ...

Reviews: