35.
Center
Rafter/Facia Nailing Plates
(2) (3/4” x 3/4” x 51”) underneath
outside of each batten. Attach with 3 - 1 1/4” screws evenly spaced into the
batten. The Rafter/Facia Nailing Plate provides for a greater nailing surface
later when you attach side facia.
34.
Position and attach 3rd row of Battens (3G) and Batten Spacers following
Steps 31-33.
Space
battens such that they are flush with the previous row of Batten Spacers as shown above.
Top View of Roof Battens
Even with
end of rafter.
Hardware
S2
- 1 1/4” Screws
x 6 total
Parts
3J
- Nailing Strips
(3/4” x 3/4” x 51”)
x 2
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 22