Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 22
40.
Position horizontal wall/ceiling
trims up against wall siding and bottom
of rafter or ceiling plywood. Evenly
space both trims on side wall from
side-to-side and attach with 1 1/2”
nails. Complete both sides.
Hardware
N1 - 1 1/2” Finishing Nails
x 24 total
Parts
7C - Horizontal Side/
Wall Ceiling Trim
(1/4” x 2” x 65)
x 4
39.
Position top horizontal trim on door header tight against
vertical trim already attached. Horizontal trim will have an
additional piece of wood already attached to the reverse face to
make it sit flush on the wall. Line up vertical trim on narrow wall to
cover seam. Position trim on narrow wall side to cover stop and
wall seam. With trims lined up, attach both with 1 1/2” nails.
41.
Position gable wall/ceiling trims up
against gable wall siding and bottom of ceil-
ing plywood. Trims will but up against ridge
cap sleeve and horizontal wall/ceiling trim.
Attach with 1 1/2” nails. Complete both sides.
Parts
8C - Gable Wall Ceiling
Trims
(1/4” x 2” x 70” -
22.5 deg.ends)
x 2
Trim on narrow
wall side
Trim with filler
attached on back
Hardware
N1 - 1 1/2” Finishing Nails
x 10 total
Horizontal
Side/Ceiling Trim
Hardware
N1 - 1 1/2” Finishing Nails
x 24 total
Gable Wall
Ceiling Trim
22.5 deg.
cut ends