Note:
The floor will be flipped over and floor runners will sit
on your foundation. It is important to note that having a
level foundation is critical. Choosing a foundation will vary
between regions. Typical foundations can be concrete
pads or patio stones positioned underneath the floor
runners.
10.
With Floor Runners attached, carefully flip the
floor over and place on your foundation.
Caution:
you
will need 2 people to assist you. Be careful when
laying floor down not to bend or twist floor. When in
place, level floor completely.
Foundations
9.
Complete all Floor Runners.
11.
Position
Plywood Floor
pieces
(6) on top of completed Floor Joists. The Plywood is cut
slightly smaller than floor framing and will sit slightly back from outside edge. Keep plywood seams
tight.
Hint:
Use a chalk
line to mark location
of floor joists to
determine screw
placement.
Front
12.
With Plywood positioned correctly on
floor framing, attach with 1 1/4” screws. Use
screws every 16”.
plywood
pushed together
at seams.
Concrete Slab
Foundation
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 9