1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 12
3. Trim Section
20.
Locate Top, Vertical and
Ledge Sash pieces. Starting with
Top Sash, position in
window cavity framing. Attach
with
6 - 1 1/2” Finishing Nails
.
Hardware (Steps 20 - 21)
N1 - 1 1/2” Finishing Nails
x 48 total
21.
Position and attach both Straight Cut Vertical Sash pieces in cavity with
6 - 1 1/2” Finishing Nails
per piece. Finally, position ledge between vertical sash pieces and attach with
6 - 1 1/2” Finishing Nails
.
Ledge will protrude out past the vertical sash slightly. Complete sash pieces for 2nd large window.
Parts (Steps 20 - 21)
3A - Straight Cut Top Sash
(1/2” x 2 7/8” x 35 7/8”)
x 1 /window
3B - Straight Cut Vertical Sash
(5/8” x 2 7/8” x 35 3/8”)
x 2 /window
3C - Straight Cut Ledge
(5/8” x 3 3/8” x 29 1/8”)
x 1 /window
Vert. Sash
Ledge
Top Sash
Flush