Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Parts (Step 86)
Flower Box Kits
x 8
Hardware (Step 86)
S1 - 2 1/2” Screws
x 16 total
86.
Assemble
Flower Box Kits
with Assembly Instructions included.
Position completed Flower Box below bottom of window trim and secure
with
2 - 2 1/2” screws
. Screw from inside of box into the center wall
stud.Attach second screw 2” underneath first screw and once again into
the wall stud. Install Flower Box Kits underneath each window/double-
window..
Hardware (Step 87)
S1 - 2 1/2” Screws
x 38 total
87.
Locate
Long Potting Shelf
and 2
Potting
Shelf Legs
. Position shelf in corner tight against
wall framing. While supporting the shelf, attach
shelf with
2 - 2 1/2” screws
to wall frame. Place leg
underneath shelf and attach to inside shelf framing
and wall framing as illustrated above with
2 - 2 1/2”
screws
.
Parts (Step 87)
Long Potting Shelves
(16” x 45”)
x 4
Short Potting Shelf
(16” x 41”)
x 1
Potting Shelf Legs
(1 1/2” x 2 1/2” x 38”)
x 9
Page 46