What to do before my Shed arrives?
Become familiar with this assembly manual and determine if you can
•
complete the project yourself or will require a professional contractor.
Clear the construction area and ensure a clear pathway for delivery when
•
the freight company arrives. Remove all debris: roots, grass, rocks, etc.
Excavate the site. Contact your local utilities company to ensure there are
•
no gas or electric lines buried in the area before digging.
Decide on the type of foundation you will be using:
•
Concrete slab, or
46 inches of crushed gravel with paver stones or 4x4 stringers.
You can find the footprint for your shed on Page 3 of your Assembly Manual.
If doing the assembly yourself, have all the necessary tools ready to go and in
•
working condition. A list of required tools can be found after the parts list.
One helper is recommended to assist in constructing your shed.
•
It generally takes two people 3 to 4 days to assemble a shed. If you’re hir
ing a contractor, their rate should be in line with that duration of work.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 2