background image

Page 2 from 2

ΑΤΤΕΝΤΙΟΝ!!!

1.  Operations  for  installation,  maintainance  or 
testing must be done by authorized personel only.
2.  The  device  must  be  connected  to  the  mains 
power  supply  thru  a  fuse  dependent  by  the  total 
amount of the line’s  power load.

In case of battery or lamp replacement, these

must be replaced by parts of the same type, by the 
manufacturer or by a competent person.

t  i

  in  battery  recycling  points.  Do  not 

incinerate.

3. 

4. In case of inactive use for a period greater than 2 
months,  disconnect  the  battery  by  pulling  out  the 
battery’s connector. 
5. 

I

s  not  allowed  to  discard  batteries  in  to 

common trash bins, they must be discarded 
only 

NOTE: 

LED= Light Emitting Diode

LABELING EXPLANATION:
X: Self contained   1: Maintained
A: Including test device  
480: 8 hour duration
NOTE!! After finishing the installation you must 
power the luminaire at least for 24 hours for 
battery charging to perform the named autonomy. 
Battery replacement

 

1. Unfasten the 4 retaining screws (step 10 of the 
installation instructions) and remove the diffusor.
2. Unfasten the 2 retaining screws step 9 of the 
installation instructions and remove the reflector.
3. Remove the old battery and place a new on of the 
same type and characteristics.
4. Replace the removed parts (previous steps 1,2).  

9

6

7

Manual TEST or Resetting Errors

In order to test or reset the device you 
must carefully remove the diffusor by 
unfastening the 4 mounting screws. 
Then push the button as described in 
the according paragraphs on page 1.  

1

8

10

L1 L N

N
L

N
L

L1

L

N

L1

L

N

External 

switch

Controlled operation of the lamp

Link

Permanent maintained operation 

1

  Remove the diffusor. Place simultaneously 2 flat blade screwdrivers and pull up gently the 

    reflector.  

2

  Install the included plastic cover in to the unused hole and install the base plastic (with the 

    included mounting screws and plugs). 

3

  

Always use in any case round mains cable, with external diameter of 6-9mm (H05RN-F 

    type 2x1mm² or any other type, at least equal to it’s mechanical and electrical properties).   
    ATTENTION!! The cable must not be deformed in any way (This requirement is important 
    to ensure the tightness isolation IP 65). 

Install

 

the cable gland, pass the round cable thru and 

    tighten it all the way.

4

  Place the battery’s connector to the corresponding connector on the P.C.B.  

 Connect the mains cables to the respective terminal block (connect the ground wire if required).  

6

  

Ν

 for neutral, 

L

 for live wire and 

L1

 for the maintained operation. The 

L1

 wire can be connected

    to an external switch to control the maintained or non maintained operation of the luminaire. 

7

  For permanent maintained operation use two wires to power the luminaire, 

Ν

 for neutral and 

L

 for 

    live wire, and link the 

L

 and 

L1

.

8

  Install the included tie (if needed) to fasten securely the power cables.

9

  Refit the reflector and fasten the two small screws (included).

10  

Finaly place the diffusor by using the 4 included screws (tightening torque 1.2 Nm).  

  

INSTALLATION INSTRUCTIONS

2

3

4

5

923940000_09_008

Reviews: