Test Programs
Maintenance Manual
3-12
Page
Do not continue the operation for longer than 5 minutes.
Wait for longer than one minute before restarting the operation.
No. 9
F-arm
horizontal
movement
check
<F-arm horizontal movement check>
This program can be used to check the F-arm horizontal movement.
Press the [Start] button.
Select the item to adjust using the menu buttons on the liquid crystal panel.
[M1]
:
Move in reciprocation continuously at the upper limit after the F-arm is raised <Upper height>
[M2]
:
Move continuously at the same height as that in normal transfer after the F-arm is raised <Normal
height>
Do not continue the operation for longer than 5 minutes.
Wait for longer than one minute before restarting the operation.
[M1]
:
Move in reciprocation continuously at the upper limit after the F-arm is raised <Upper height>
Press the [Start] button.
Select the operation speed using the menu buttons on the liquid crystal panel.
[M1]: High speed <Fast speed> [M2]: Medium speed <Middle speed>
[M3]: Low speed <Slow speed>
•
If you do not specify anything here, the loader will operate at the high speed [M1]: High speed
<Fast speed> setting.
Press the [Start] button, and the loader starts the operation.
If the loader has not been initialized, initialization starts.
①
Raises the F-arm
②
Move the F-arm horizontally (Horizontal middle point position
→
Macro position)
③
Move the F-arm horizontally (Macro position
→
Stage position)
④
Move the F-arm horizontally (Stage position
→
Macro position)
The loader then repeats steps
①
to
④
.
•
Press the [Start] button to pause the operation at the break point.
•
The speed can be changed during the pause.
•
When an error occurs, the loader displays the same error code as in the regular operation, and then
stops.
•
The above operation pattern indicates the F1-arm (upper side) operation.
•
Press the [Quit] button, and the F-arm returns to its initial position and the loader stops the operation.
CAUTION
CAUTION
Summary of Contents for AL120-12 Series
Page 2: ...This page intentionally left blank...
Page 13: ...Operation Maintenance Manual Introduction Conformity Standards i 11 Page...
Page 14: ...Introduction Conformity Standards Operation Maintenance Manual i 12 Page...
Page 16: ...Maintenance Manual Table of Contents C 2 Page This page intentionally left blank...
Page 59: ...Maintenance Manual Test Programs 3 31 Page This page intentionally left blank...