Getting Started FLUOVIEW/
Outline of LSM Observation Procedures
OPERATION INSTRUCTIONS
1 - 1 1
Page
1-2-1 Turning Power On
Set the power switch of each unit to ON, then start the software.
For details, see sections 1-1 “Turning the Power On” and section 1-2 “Starting the Software”
in Volume II [PREPARATION For OPERATION] of [HARDWARE GUIDE] of the FV1000
User’s Manual.