OMAX JetMachining® Center Operator’s Guide
Operation
3 - 12
400433D-EN
6.
Use the Layout Path Special Tool to specify the machine path.
• Configure the path either manually or automatically.
• Render as a Solid to verify the outcome.
• Run collision detection and correct any found.
7.
Save your final path drawing. Layout automatically saves it as an OMAX .ord file.
Note:
Consult the OMAX Interactive Reference for a detailed Layout tutorial and any additional drawing
information.
Cutting Parts
WARNING!
Safe operation of this equipment requires that you have read and can practice all the safety
“dos” and “don’ts” presented in “Chapter 1: Safety First.”
Setting Up the Hardware
1.
Before powering up this equipment, ensure that you and other operators have access to the
required protection devices (safety glasses, ear plugs, and rubber gloves).
2.
Switch the main power breaker
On
for your OMAX equipment.
3.
If installed, close the bleed valves on the bulk hopper and common water air tank.
4.
Switch the air supply valve
On
.
5.
Switch the water supply valve
On
.
6.
Check the white water tank inside the pump (Figure 3-7) to verify the water level is between one-
half and three-fourths full.
7.
Power up the OMAX high-pressure pump as follows:
a.
Turn the pump control panel switch
On
. Verify pump operation by checking for valid RPM and
KSI readings on the pump’s LCD screen.
b.
Turn the charge pump control panel switch
ON
. Inspect the cooling flow from the three hoses
in the white water tank for a similar flow from each. When holding each horizontally, the water
should stream out 2-4 inches before dropping.
Figure 3-7: White Water Tank Internal View
WARNING!
Always run the charge pump for approximately 15 minutes following its initial power up and
when the pump has been inactive for 30 minutes or more. This allows cool water to circulate
and cool off the dynamic seal area of the pump, ensuring that pump seals are cooled down
prior to high-pressure operation.
return water
hoses (3 ea.)
Summary of Contents for JetMachining Center 2626
Page 8: ...OMAX JetMachining Center Operator s Guide viii 400433D EN ...
Page 12: ...OMAX JetMachining Center Operator s Guide xii 400433D EN ...
Page 22: ...OMAX JetMachining Center Operator s Guide Safety First 1 10 400433D EN ...
Page 140: ...OMAX JetMachining Center Operator s Guide OMAX Glossary 6 16 400433D EN ...
Page 144: ...OMAX JetMachining Center Operator s Guide Index 4 400433D EN ...