background image

Safety instructions

 

 

 

 

2.2 

Five safety rules 

Before connecting any test leads to a test object, always observe the five safety 

rules for working with high power: 

  Disconnect completely. 

  Secure against re-connection. 

  Verify that the installation is dead. 

  Carry out grounding and short-circuiting. 

  Provide protection against adjacent live parts. 

 

2.3 

Instructions 

  Read the safety instructions and setup information described in the 

SPECTANO 100 Quick Start Guide before operating 

SPECTANO 100 

or its 

accessories. In addition, read the manuals of all devices included in the test 

setup. Any maloperation can result in damage to property or persons. 

  Use 

SPECTANO 100 

and its accessories only in a technically sound 

condition and when its use is in accordance with the local safety regulations. 

In particular, avoid disruptions that could in turn affect safety. 

  Before using 

SPECTANO 100

, always ensure that neither the device nor its 

accessories are damaged. 

  Connect the equipotential ground of 

SPECTANO 100 

with a solid 

connection of at least 6 mm

cross-section and not longer than 20 meters to 

a ground connection in the laboratory. Never handle 

SPECTANO 100 

without grounding it. 

  Ensure that all ground connections are in good condition, clean, and free of 

oxidation. 

  Connect any parts of the test cell which have to be connected to ground 

according to the related manual. 

  Only use the delivered grounded AC power supply DRA SUPPLY to power 

SPECTANO 100

. Never use power outlets without protective ground (PE). 

  Always turn off 

SPECTANO 100 

(with the power switch on the back) before 

connecting or disconnecting any cables or changing the test cell. Be 

especially careful when using unsafe adapter cables (for example, BNC 

adapter). 

  Ensure that no dangerous voltages are present at touchable parts of the test 

setup. If this is not possible due to, for example, unsafe adapter cables or 

connectors or unsafe test cells always secure the danger zone with clearly 

visible barriers before performing tests. 

Summary of Contents for SPECTANO 100

Page 1: ...Smart Measurement Solutions SPECTANO 100 Quick Start Guide...

Page 2: ...electric test sample box 11 5 4 Frequency domain spectroscopy FDS 11 5 5 Polarization current method PDC 11 5 6 DSH 100 Dielectric Sample Box 11 5 7 Combined mode FDS and PDC 12 5 8 Scope of delivery...

Page 3: ...NO 100 Quick Start Guide 2 7 5 Connect SPECTANO 100 to the DTS1 dielectric test sample box 28 7 6 Connect SPECTANO 100 to the Dielectric Sample Holder DSH 100 29 Support 31 Technical support get suppo...

Page 4: ...extensive and more detailed information about SPECTANO 100 its installation and intended use and how to configure and operate it The SPECTANO 100 User Manual is available in PDF format on the DVD deli...

Page 5: ...ltages up to 200 Vpeak AC and DC Before starting to work clearly establish the responsibilities Personnel receiving training instructions directions or education on SPECTANO 100 must be under constant...

Page 6: ...hat neither the device nor its accessories are damaged Connect the equipotential ground of SPECTANO 100 with a solid connection of at least 6 mm2 cross section and not longer than 20 meters to a groun...

Page 7: ...bility and risk Full compliance with the local safety regulations also includes followingthe instructions provided in the SPECTANO 100 Quick Start Guide or theUser Manual 2 5 Designated use SPECTANO 1...

Page 8: ...or the use of SPECTANO 100 may vary between customers and end users Consequently this document is offered as a guide only It shall be used in conjunction with the customers own safety procedures maint...

Page 9: ...for meeting the requirements of the member states regarding the electromagnetic compatibility EMC directive the low voltage directive LVD and the RoHS directive FCC compliance USA This equipment has b...

Page 10: ...e Table 4 1 SPECTANO Analyzer Suite PC requirements Characteristic Requirement Processor Current Intel or Intel compatible CPU Memory RAM 2 GB 4 GB recommended Graphics resolution Super VGA 1024 768 h...

Page 11: ...insulationmaterials Monitoring of polymerization and hardening processes Analysis of nanocomposites Research on dielectrics Analysis of ceramics Analysis of thin films 5 2 Methods The following list g...

Page 12: ...ents of international standards for dielectric material analysis ASTM D150 IEC 62631 2 1 and 62631 3 1 2017 The DSH 100 can be used in conjunction with other impedance analyzers or LCR meters such as...

Page 13: ...ke very long at low frequencies It combines the advantages of both principles It measures data in the time domain for frequencies below 100 mHz This reduces the measurement time up to 75 compared to e...

Page 14: ...SPECTANO 100 main device OL000400 DTS1 dielectric sample test box 2 Triaxial standard cable 1 5 m Specific grounded SPECTANO 100 power supply CD ROM incl SPECTANO Analyzer Suite and User Manual Engli...

Page 15: ...SPECTANO 100 Quick Start Guide 14 5 7 2 Optional accessories 2 Triaxial to 4 mm plug adapter cable set 2 Triaxial to BNC connector adapter cable set OL000451 OL000452 Description Part No Picture...

Page 16: ...SPECTANO 100 6 1 1 Connectors and operating controls DANGER INPUT connector Figure 6 1 SPECTANO 100 front view Death or severe injury caused by high voltage or current Do not touch the OUTPUT connecto...

Page 17: ...d from SPECTANO 100 after the measurement was started An error has occurred during measurement Measurement is stopped After a computer has been connected to SPECTANO 100 the error information is sent...

Page 18: ...otective ground PE Only use the delivered grounded AC power supply DRA SUPPLY to power SPECTANO 100 Connect the SPECTANO 100 power supply only to a power outlet thatis equipped with protective ground...

Page 19: ...nt Use the DTS1 box only together with the SPECTANO 100 test device and the delivered accessories and cables Read the safety instructions in 2 Safety instructions in this Quick Start Guide before usin...

Page 20: ...the INPUT connector of SPECTANO 100 Input connector signal source input Max continuous input current 50 mApeak to connect to the OUTPUT connector of SPECTANO 100 Sample 2 RC circuit for more informati...

Page 21: ...C requirements on page 9 To install SPECTANO Analyzer Suite put the delivered SPECTANO Analyzer Suite DVD in the DVD drive of your computer and follow the instructions on the screen Avoid serious inju...

Page 22: ...uter 1 Connect the USB 2 0 or higher cable to the USB connector on the SPECTANO 100 rear panel 2 Connect the USB cable to the USB connector of your computer by using the delivered USB 2 0 cable Death...

Page 23: ...livered one DRA SUPPLY electric shock from hazardous parts of the device test cell or sample Always observe the five safety rules see 2 Safety instructions on page 4 Before performing a test with SPEC...

Page 24: ...cable Death or severe injury caused by high voltage or current Before handling SPECTANO 100 in any way connect its equipotential ground terminal with a solid connection of at least 6 mm2 cross section...

Page 25: ...triaxial to BNC adapter Triaxial to 4 mm plug adapter The three contacts inner conductor inner shield and outer shield of the triaxial connection are led through separately They end in a 4 mm plug Ad...

Page 26: ...p for a test cell with guard ring Figure 7 4 Guard ring Connecting SPECTANO 100 to a test cell with guard ring Death or severe injury caused by high voltage or current Do not touch the OUTPUT connecto...

Page 27: ...cable to the blue marked standard cable 4 Connect the adapter cables to the test cell with guard ring according tothe schematic diagram Note If you are using the triaxial to 4 mm plug adapter cable b...

Page 28: ...l connection BNC or 4 mm plug connect one of the adapter cables described earlier in this chapter with the corresponding color code to the standard triaxial cable Red labeled adapter cable to the red...

Page 29: ...in any way connect the test object to ground properly Do not connect or operate SPECTANO 100 with a broken dirty or oxidized ground terminal or connection cables Do not use power outlets without prot...

Page 30: ...CTANO 100 to the DTS1 dielectric test sample box for measuring on the Sample 1 connector1 7 6 Connect SPECTANO 100 to the Dielectric Sample Holder DSH 100 Connect SPECTANO 100 to OMICRON Lab s DSH 100...

Page 31: ...e not observed Read the safety instructions in this user manual as well as the safety instructions and corresponding chapters in the DSH 100 user manual first Always connect the SPECTANO 100 earth ter...

Page 32: ...tions under www omicron lab com support or support omicron lab com At our technical support hotline you can reach well educated technicians for all of your questions Competent and free of charge Make...

Page 33: ...Version 3 0 info omicron lab com www omicron lab com OMICRON Lab 2020 SPECTANO 100 Quick Start Guide engl All rights reserved ENU 1134 03 03...

Reviews: