OMNI 4000/7000 Operations and Maintenance Guide
– Rev F
3-41
OMNICONNECT® Operations
4.
For gas applications, select a Meter Run or
Station in the
Batch
list.
5.
In the
Batch Control
screen to the right,
click the
End Batch
button to manually
end your selected batch.
6.
Ending a batch automatically generates a
report. Go to Section 4.5.5 for more
information on Batch Reports.
Automatic Batch End
To automatically end a batch on a set schedule, follow these instructions:
1.
In the Actions ribbon, click
Configure
.
2.
Select
Batch
in the
Configure
tree. This
opens both the
Batch Setup
and
Batch
Scheduling
screens.
3.
a. Click on the
Batch Scheduling
tab to
create a schedule for the batch
ends
—hourly, weekly, or monthly—for
both the Meter Runs and the Stations.
b. Click
Apply
to save your changes.
The
Independent Meter Runs
options group refers to all Meter
Runs not grouped within a Station.
The schedule set up here applies
to all independent Meter Runs
associated with this flow
computer, not to any singular
Meter Run (such as Meter Run 1).