Mounting and Connecting Devices
19
ZG2-DSU User’s Manual
1
BEFORE USE
Attaching the Ferrite Core
1
Attach the ferrite core (supplied)
to the Data Storage Unit's I/O
cable.
Connecting the Power Supply
1
Connect the power wire (brown)
and GND wire (blue) of the Sensor
Controller's I/O cable to the 24
VDC (
±
10%) power supply.
The following power supply is recommended:
• S8VS-03024 (24 VDC, 1.3 A)
Be sure to connect the Data Storage Unit to
the power supply in a 1:1 connection.
Ferrite core
H
LD
ON
ZER
O ENABL
E
P
L
H
LD
ON
ZER
O ENABL
E
P
L
N
ot
e
Summary of Contents for 257553
Page 1: ...User s Manual Cat No Z289 E1 02 Smart Sensor Data Storage Unit ZG2 DSU...
Page 10: ...8 ZG2 DSU User s Manual MEMO...
Page 14: ...12 ZG2 DSU User s Manual MEMO...
Page 38: ...Loading Logging Data to an External Device 36 ZG2 DSU User s Manual MEMO...
Page 42: ...Transferring Bank Data to the Controller 40 ZG2 DSU User s Manual MEMO...
Page 52: ...Bank Functions 50 ZG2 DSU User s Manual MEMO...
Page 86: ...Updating the Firmware 84 ZG2 DSU User s Manual MEMO...
Page 89: ...6 APPENDICES INDEX 87 ZG2 DSU User s Manual MEMO...
Page 91: ......