background image

1

 

  Preparation 

1-3

 

Installation 

BUM150RA 

15 

 

×

×

Install upside down

Stack on the vertical

BATTERY

UNIT

BA
T

T

ER
Y

UNI
T

 

 

Summary of Contents for BUM150RA

Page 1: ...nformation Thoroughly read and understand this manual before installing and using the product Keep this manual in a convenient location so that you can refer to it whenever necessary The contents of this manual are subject to change without notice The warranty is included with the product ...

Page 2: ...this unit to a third party please include all of the documentation that came with this unit This is to ensure that the unit is used in line with the conditions described in the included documentation This manual contains important safety related information Please read and understand the contents of the manual before beginning operation If you discover any omissions or errors in the manual please ...

Page 3: ...3 Installation 11 2 Installation 16 2 1 Rackmount installation EIA JIS 19 inch rack server rack 16 2 2 Stationary installation 19 3 Connection 21 3 1 Connecting the battery unit 21 3 2 Connecting the additional battery unit 23 4 Replacing the battery 25 Notification that the battery needs to be replaced 26 Procedure for replacing the battery 27 5 References 33 5 1 Dimensions 33 ...

Page 4: ...repair or modify the product Doing so may cause an electric shock or a fire If liquid leaks from the product do not touch it Doing so may cause blindness or burns If it touches your eyes or skin wash it out with lots of clean water and consult your doctor Warning product use Do not use this product in applications which require an extremely high degree of reliability and safety such as those liste...

Page 5: ...alfunction Do not exceed the ranges specified for environmental conditions during use storage Do not install or store the unit in the places listed below Do not store in places where the humidity is lower than 10 or higher than 90 Do not use the unit in places where the ambient temperature is lower than 0 C or higher than 40 C Do not use in places where the humidity is lower than 25 or higher than...

Page 6: ... to become wet Doing so may cause an electric shock or a fire If the unit becomes wet immediately stop using it and have it inspected and repaired For information about repairs contact us Do not insert metal objects into the battery connectors Doing so may cause an electric shock If you notice an abnormal sound or smell smoke or leaking fluid immediately turn OFF the unit s Power switch and stop t...

Page 7: ...use an electric shock or a fire If fluid dilute sulfuric acid leaks from the interior do not touch the fluid Doing so may cause blindness or burns If the fluid contacts your eyes or skin wash it out with lots of clean water and consult your doctor Do not throw the unit into fire The lead battery in the unit may explode or leak dilute sulfuric acid Do not insert metal objects into the power supply ...

Page 8: ...th metal objects Doing so could cause an electric shock fire or burn Some electrical energy still remains inside the spent battery Do not dispose of batteries in a fire The batteries may explode Dispose of used batteries according to the instructions Do not use a new battery and an old battery at the same time Dilute sulfuric acid may leak A battery can present a risk of electrical shock and high ...

Page 9: ...orter or the battery may become unusable We recommend keeping the temperature 25 C or less when storing the unit for long periods of time Connect the AC input plug of the UPS to a wall outlet commercial power for at least 24 hours at the following intervals Every 6 months when storage temperature is 25 C or less Every 2 months when storage temperature is 40 C or less Turn OFF the power switch of t...

Page 10: ... accessories 1 2 Checking the accessories Make sure that all accessories are included and that there is no external damage If you notice any defects immediately contact us Rubber feet for landscape layout 1 19 inch racks support angle 1 Fixing bracket 1 Screws for fixing bracket 4 Precautions Japanese English Chinese 1 Battery replacement date label 1 Serial number label 2per set Product warranty ...

Page 11: ...9 inch racks support angle 1 3 Installation When installing this device this device permits the following installing methods Correct positions Installation by stacking the unit and the UPS Install the UPS on an additional battery Do not install the unit upside down It is possible to stack up to 2 devices one UPS and one unit When installing 3 or more devices one UPS and 2 or more additional batter...

Page 12: ... 1 3 Installation BUM150RA 12 Installation by positioning the unit and the UPS vertically A display panel must be at upper part When installing them vertically it is possible to install up to 6 additional batteries ...

Page 13: ...1 Preparation 1 3 Installation BUM150RA 13 1 Incorrect positions Install front side down Install rear side down Install on UPS Install right side down BASSERY UNIS BASSERY UNIS ...

Page 14: ...1 Preparation 1 3 Installation BUM150RA 14 ...

Page 15: ...1 Preparation 1 3 Installation BUM150RA 15 1 Install upside down Stack on the vertical BASSERY UNIS BASSERY UNIS ...

Page 16: ...hout the support angles the front clamp alone cannot support the weight of the UPS The mass of each unit Approx 31kg In a case where the UPS is to be mounted on a rack place it on the low part of the rack Dropping it may result in injury Be sure to use the supplied mounting screws Use of long screws other than those supplied for case mounting may damage inside the unit Screws other than those supp...

Page 17: ...the screws that were half tightened 2 3 EIA standards Use the 8 included rack fixing screws and nuts medium sized to securely fasten the front the side displaying L or R and back of the support angles to the server rack The screw holes are located at the top and bottom for both front and rear JIS standards For JIS standards use a total of 6 included screws to fix the rack 1 JIS rack fixing flat he...

Page 18: ...le Server rack 4 Use the 8 included ear bracket mounting screws 2 sets of 4 screws to securely fasten the ear brackets to the left and right sides of the unit 4 Ear brackets 5 Place the UPS on the support angles and push it completely into the rack 5 and use the 2 included EIA JIS rack fixing screws M5 and unit fixing nuts to securely fasten the ear brackets to the server rack 6 ...

Page 19: ...asten Note Always use the support angles 2 2 Stationary installation Perform installation only as shown in the diagrams below Horizontal installation Attach the included rubber feet for horizontal installation and position the unit horizontally Make sure that this product does not slide or fall BATTERY UNIT ...

Page 20: ... UPS unit on the left and right sides with M4 binding head 4 screws Attach the fixing brackets for vertical layout with M4 binding head 4 screws Stand for vertical layput BATTERY UNIT BATTERY UNIT BATTERY UNIT Fixing brackets Ttand for vertical layput When one expansion battery units are connected When two or more expansion battery units are connected ...

Page 21: ...Caution for connection To connect an expansion battery unit pull out the UPS s power cable to turn the power off After expansion set the number of expansion battery units in the operation mode settings 1 Detach the battery expansion connector cover on the back of the UPS unit Loosen one screw at the bottom of the battery expansion cover when detaching Battery expansion connector cover 2 Connect th...

Page 22: ...pansion on the front of the expansion battery unit turns on If the LED does not turn on check the connection condition 4 Set the number of expansion batteries For the setting procedure refer to Instruction Manual of UPS Additional information When one battery unit is connected with the UPS BU150R backup time is 55 minutes with 700w equipment initial battery value at an ambient temperature of 20 C ...

Page 23: ...tional battery connector on the back of the unit Loosen one screw at the bottom of the battery expansion cover when detaching Battery expansion connector cover 2 Connect the connection cable for the expansion battery unit to the battery expansion connector on the back of this unit Battery expansion connector Connection cable 3 Turn ON the overcurrent protection switch on the back of the additional...

Page 24: ...ED does not turn on check the connection condition 4 Set the number of expansion batteries For the setting procedure refer to Instruction Manual of UPS Additional information Refer to 4 1 4 Estimated backup time of the UPS manual BU150R about the backup time each expansion units When one or more expansion battery units are connected the charging time become longer 24 hours per an expantion battery...

Page 25: ...displayed Reset the battery life counter with the AC input plug connected Stopping Power switch OFF When the beeper becomes a sustained beep release the switch In Commercial Power Mode Power switch ON When the beeper changes from intermittent beeps to a sustained beep release the switch If you do not reset the battery life counter a battery deterioration alarm may occur faster than the expected ba...

Page 26: ...ll be incremented at a faster pace Notes The lead battery used in the unit has a limited lifespan The life varies depending on your storage use environment and backup frequency The nearer the end of the life is the more rapidly deterioration proceeds Refer to the below shown reference data 10 3 Battery life of the UPS manual BU150R for the details about the life of the battery Even if battery is s...

Page 27: ...the front panel towards you to detach the front panel Do not pull the front panel strongly towards you The clamp may be damaged Pull the front panel towards you a little first and detach the front panel while sliding it to the right Pull the right side of the front panel towards you to detach the front panel Loosen the two screws with a screwdriver Front panel side 2 Remove the battery connectors ...

Page 28: ...ng the battery BUM150RA 28 3 Remove the screw on the sheet metal cover S h e e tm e ta lco v e r S cre w 4 Lightly push in the sheet metal cover to the right first and pull the left side towards you to detach it ...

Page 29: ...ed tape attached to the top of the battery pack appears you can completely remove the battery by pulling it towards you 10cm more Hold the battery tight with both hands and be careful not to drop the battery To pull out the battery pack do not take hold of its connector or cable Handle with care as the battery pack is heavy object Recess Red tape ...

Page 30: ... Insert a new battery into the UPS as far as it will go Replacement battery pack model BUB150RA Recess Red tape 7 Insert the right end of the sheet metal cover into the UPS unit push the left side in and attach it by sliding it to the left ...

Page 31: ...9 Connect the battery connector and insert the connector s groove into the holder Attach the battery cable to the cable holder Note You may hear a pop sound when you connect the battery if it is replaced after the unit s operation is stopped but this sound is not abnormal ケーブルホルダ ...

Page 32: ...he UPS unit and push the right side of the front panel in Securely tighten the two screws on the right side of the front panel with a screwdriver Push the right side of the front panel in Tighten the two screws Insert the clamp on the left side of the front panel into a groove on the UPS unit Front panel side Battery replacement is now complete ...

Page 33: ...5 References 5 1 Dimensions BUM150RA 33 5 5 References 5 1 Dimensions Unit mm Tolerance 2mm BUM150RA 438 480 87 BATTERY UNIT ...

Page 34: ...5 References 5 1 Dimensions BUM150RA 34 Stand for vertical layput BATTERY UNIT 200 200 70 50 70 50 ...

Page 35: ...5 References 5 1 Dimensions BUM150RA 35 5 Rubber feet 23 25 405 50 40 358 40 3 BATTERY UNIT ...

Page 36: ...5 References 5 1 Dimensions BUM150RA 36 Using Ear brackets 44 5 22 0 13 5 455 25 465 BATTERY UNIT Fixing bracket 43 8 5 40 10 ...

Page 37: ...K1L D 15108D No part or whole of this manual may be reproduced without permission The contents of this manual are subject to change without notice ...

Reviews: