D41G
27
Set-up and Maintenance/Disassembly and Disposal
Set-up and Maintenance
Functional testing
The safety function of the safety components must be tested. The following conditions must be previously checked and met:
1.
Fitting of the Switch and the actuator
2.
Check the integrity of the cable entry and connections
3.
Check the switch enclosure for damage
Maintenance
Maintenance frequency
SIL3 / PLe at least once a month
SIL2 / PLd at least once a year
(Daily inspection)
• For each guard door, check that the machine stops when the guard door opens. (Inspection every 6 months)
1.
Check for tight installation of the safety door switch and the actuator.
2.
Check maximum axial offset of the safety door switch and the actuator.
3.
Remove particles of dust and soiling
4.
Check cable entry and connections
Disassembly and Disposal
Disassembly
The product must be disassembled in a de-energized condition only.
Disposal
The product must be disposed of in an appropriate manner in accordance with the national prescriptions and legislations.
Summary of Contents for D41G
Page 28: ...MEMO 28...