CHAPTER 4 APPLIED OPERATION
E5CK
4--20
•
After calibrating input, make sure that you check indication accuracy to
make sure that the E5CK controller has been correctly calibrated.
•
Operate the E5CK controller in the PV/SP monitor (level 0 mode) mode.
•
Check the indication accuracy at the upper and lower limits and mid-
point.
•
Preparation
The following figure shows the required device connection. Make sure
that the E5CK controller and cold junction compensator are connected
by a compensating conductor for the input type that is to be used during
actual operation.
5
4
3
2
1
10
9
8
7
6
13 14
11 12
STV
Cold junction
compensator
Compensating
conductor
SOURCE
AC100-240V
(AC/DC24V )
•
Operation
Make sure that the cold junction compensator is at 0
_
C, and set STV out-
put to the voltage equivalent to the starting power of the check value.
•
Preparation
The following figure shows the required device connection.
5
4
3
2
1
10
9
8
7
6
13 14
11 12
6-dial
SOURCE
AC100-240V
(AC/DC24V )
•
Operation
Set the 6-dial to the resistance equivalent to the check value.
•
Preparation
The following figure shows the required device connection.
5
4
3
2
1
10
9
8
7
6
13 14
11 12
STV
SOURCE
AC100-240V
(AC/DC24V )
•
Operation
Set the STV to the current or voltage value equivalent to the check value.
J
Checking indica-
tion accuracy
F
Thermocouple
F
Platinum resis-
tance thermome-
ter
F
Current or volt-
age input