240
Chapter
4
Cha
nging Set
tings
with SD
Ma
nag
e
r 3
F3SG-SR/PG
User’s Manual
Setting with SD Manager 3
Designated Beam Output Setup Procedure
1.
Set the output operation mode of the auxiliary output in [Designated beam output information], and
press the [Zone Setting] button.
2.
Enable the designated beam output function (No.1).
3.
Set up the zone (Refer to
Designated Beam Output Zone Setup Procedure
below.) (No. 2, 3, and 4).
4.
Set up the designated beam unblocked state (No. 5).
5.
Click the [Write configuration] button. On the settings list which will appear, confirm that the changed
settings are correct, and click the OK button.
Designated Beam Output Zone Setup Procedure
Select a setup method (No. 2)
[Setting by Manual] (No. 3)
Select a zone No., and set up the bottom and top beam numbers.
Click the [Execute] button in [Confirm zone] to determine the designated beam output zone between
the bottom and top beams configured above. (No. 4)
[Setting by Teach-in]
Selecting [Teach-in] switches the state to the Teach-in mode.
Block the F3SG-SR/PG in the zone that you wish to set up as the designated beam output zone.
Click the [Execute] button in [Confirm zone] to determine the designated beam output zone between
the bottom and top beams blocked. (No. 4)
Select [Manual] in [Setting by] after the zone is determined (No. 2).
Summary of Contents for F3SG-PG Series
Page 18: ...xvi Introduction F3SG SR PG User s Manual...
Page 30: ...xxviii Introduction F3SG SR PG User s Manual...
Page 74: ...44 Chapter 1 List of Models F3SG SR PG User s Manual Overview and Specifications...
Page 180: ...150 Chapter 2 IO Link F3SG SR PG User s Manual System Operation and Functions...
Page 438: ...408 Chapter 7 Maintenance Checklists F3SG SR PG User s Manual Checklists...