8
Connect the LED light electrical connector to the PCA board and then secure the cable with a
new cable tie using the same orientation that was observed in step 5.
9
Reverse steps 1 to 3 to complete this procedure.
6-9-4
Operator Panel Replacement / Removal Procedure
Use the following procedure to remove or replace the Operator Panel located on the AMR.
Additional Information
If the Operator Panel has been relocated to the payload structure, its replacement procedure
will vary accordingly.
The following items are required for this procedure.
• A replacement Operator Panel (if replacing and not relocating).
• 7 mm nut driver.
• Cable tie.
1
Unlatch the skin and pull it away from the AMR so that you can disconnect the cable. Refer to
6-9-1 Removing and Replacing Skins
on page 6-18 for more information.
2
Remove the cables from the connectors on the back of the Operator Panel.
3
Disconnect the remaining cable from its corresponding connector that is fastened to the AMR.
Take note of the cable ties that need to be removed and the cable routing for reassembly.
4
Remove the four locknuts that attach the Operator Panel to the mount bracket using a 7 mm
nut driver.
The locknuts are located on the back of the mounting bracket as shown below.
x4
5
Remove the Operator Panel from the mounting bracket.
6 Maintenance
6-25
HD-1500 Platform User's Manual (I645)
6-9 Replacing Items
6
6-9-4
Operator Panel Replacement / Removal Procedure
Summary of Contents for HD-1500 Platform
Page 1: ...HD 1500 Platform User s Manual I645 E 03 ...
Page 6: ...Manual Information 4 HD 1500 Platform User s Manual I645 ...
Page 38: ...Revision History 36 HD 1500 Platform User s Manual I645 ...
Page 206: ...5 Troubleshooting 5 14 HD 1500 Platform User s Manual I645 ...
Page 236: ...6 Maintenance 6 30 HD 1500 Platform User s Manual I645 ...
Page 250: ...Appendices A 14 HD 1500 Platform User s Manual I645 ...
Page 251: ...I Index I 1 HD 1500 Platform User s Manual I645 I ...
Page 254: ...Index I 4 HD 1500 Platform User s Manual I645 ...
Page 255: ......