3-1
Installation Introduction
The general AMR installation steps are provided below.
WARNING
The Charging Station, battery, and AMR transfer high electric power and contain haz-
ardous voltages. You must take necessary precautions to avoid electric shock. Follow
appropriate Lock-Out, Tag-Out (LOTO) instructions prior to any installation and main-
tenance work performed on or near these items.
Additional Information
Unpack all equipment before beginning the AMR configuration procedure.
Refer to
on page A-2 for more information.
1
Install the Charging Station.
Refer to
3-2 Charging Station Installation
on page 3-3 for more information.
2
Install and charge the battery.
Refer to
3-3 Battery Installation Procedure
2-7 Charging Station Specifica-
on page 2-14 for more information.
3
Configure the network connections.
Refer to
on page 3-11 for more information.
4
Install the payload structure and make all electrical connections..
Refer to
on page 3-23 and
5
Install optional items.
Refer to
on page 1-21 for more information.
6
Attach warning labels.
Refer to
on page 3-35 for more information.
7
Perform safety commissioning.
Refer to
on page 3-36 for more information.
8
Generate a map for the AMR.
Refer to
on page 3-37 for more information.
3 Installation
3-2
HD-1500 Platform User's Manual (I645)
Summary of Contents for HD-1500 Platform
Page 1: ...HD 1500 Platform User s Manual I645 E 03 ...
Page 6: ...Manual Information 4 HD 1500 Platform User s Manual I645 ...
Page 38: ...Revision History 36 HD 1500 Platform User s Manual I645 ...
Page 206: ...5 Troubleshooting 5 14 HD 1500 Platform User s Manual I645 ...
Page 236: ...6 Maintenance 6 30 HD 1500 Platform User s Manual I645 ...
Page 250: ...Appendices A 14 HD 1500 Platform User s Manual I645 ...
Page 251: ...I Index I 1 HD 1500 Platform User s Manual I645 I ...
Page 254: ...Index I 4 HD 1500 Platform User s Manual I645 ...
Page 255: ......