Before beginning the mounting procedure, have the following tools and resources available. Prepare
the mounting holes before beginning the mounting procedure.
• Prepare the mounting holes.
• A torque wrench for proper tightening of the mounting bolts.
• Assistance to lift and maneuver the robot into the mounting position.
• Four socket-head cap screws with flat washers. Refer to
2-5-3 Mounting Hardware and Torques
page 2-17 for more information.
1
Using the dimensions provided in
2-1-2 Mounting Flange Dimensions
four holes in the mounting surface to accommodate the user-supplied machine bolts (specified
above). A slot and hole are provided in the mounting flange for dowel pins.
2
Maneuver the robot into position on the mounting surface.
3
Align the holes in the mounting flange with the prepared mounting holes in the mounting sur-
face.
4
Insert all four bolts with washers to secure the robot to the mounting surface.
5
Tighten the four bolts to 31 N-m of torque.
Additional Information
After mounting the robot, check the mounting bolt torque after 72 hours of initial operation and
then recheck every 3 months thereafter. Refer to
more information.
6
After all four bolts have been tightened to the specified torque, the mounting procedure is com-
plete.
3 Installation
3-6
i4L Robots with EtherCAT User's Manual (I659)
Summary of Contents for i4-350L
Page 1: ...i4L Robots with EtherCAT User s Manual i4 350L i4 450L i4 550L I659 E 01...
Page 6: ...Manual Information 4 i4L Robots with EtherCAT User s Manual I659...
Page 54: ...1 Overview 1 26 i4L Robots with EtherCAT User s Manual I659...
Page 72: ...2 Specifications 2 18 i4L Robots with EtherCAT User s Manual I659...
Page 122: ...3 Installation 3 50 i4L Robots with EtherCAT User s Manual I659...
Page 138: ...4 Operation 4 16 i4L Robots with EtherCAT User s Manual I659...
Page 169: ...I Index I 1 i4L Robots with EtherCAT User s Manual I659 I...
Page 172: ...Index I 4 i4L Robots with EtherCAT User s Manual I659...
Page 173: ......