52
Nomenclature and Functions
Section 4-2
Hard-wired Terminal Block
Be sure the wires connected to the hard-wired output terminals have a total
length of no more than 3 meters.
CONECT1/2: These signal lines are used to confirm that the NSH5 Cable is
connected to the Removable Box. Attaching the connector will
short the CONECT1 and CONECT2 pins. When using a PLC
I/O Unit, use these signal lines to confirm the connection.
ENB-CH1/2: These signal lines are used to confirm the key switch condition
when using the NSH5 in Teaching Mode. If the key switch is
turned ON, the internal relay is turned ON, which will short the
ENB-CH1 and ENB-CH2 pins. (The key ON/OFF position can
be checked using external contacts.) Use these signal lines
when using the enabling switch as described in
Appendix D
Recommended Enabling Circuits
.
24 VDC/0 VDC: Power to the NSH5 is supplied from the NSH5-AL001.
EMG1A1/EMG1A2
EMG2A1/EMG2A2
When the power is OFF, the internal relay (NC) is turned ON, placing the stop
switch line in loopback status.
When the power is ON, the internal relay (NC) is turned OFF, and the stop
switch line is connected to the NSH5.
Pin No.
Signal
Contents
1
NC
Not connected
2
NC
Not connected
3
CONECT1
Cable Connection Confirmation Line
4
CONECT2
Cable Connection Confirmation Line
5
F1
Function switch F1
6
F2
Function switch F2
7
F6
Function switch F6
8
F7
Function switch F7
9
SWCOM
Function switch common
10
ENB1A1
Enabling switch line 1
11
ENB1A2
Enabling switch line 1
12
ENB2A1
Enabling switch line 2
13
ENB2A2
Enabling switch line 2
14
EMG1A1
Stop switch line 1
15
EMG1A2
Stop switch line 1
16
EMG2A1
Stop switch line 2
17
EMG2A2
Stop switch line 2
18
ENB-CH1
Key Switch Confirmation Signal Line
19
ENB-CH2
Key Switch Confirmation Signal Line
20
24 V
+24-V power supply input
21
0 V
0-V power supply input
22
FG
Frame ground
1
3
2
5
4
7
9
11
6
8
10
1 3
15
17
19
21
12
14
16
18
2 0
22
1
3
2
5
4
7
9
11
6
8
10
1 3
15
17
19
21
12
14
16
18
2 0
22
Summary of Contents for NSH5
Page 2: ......
Page 4: ...iv ...
Page 12: ...xii ...
Page 16: ...xvi ...
Page 24: ...xxiv EC Directives 6 ...
Page 58: ...34 Installing the Mounting Bracket Section 2 5 ...
Page 86: ...62 Connection Method Section 4 5 ...
Page 92: ...68 Precautions When Replacing the PT Section 5 4 ...
Page 98: ...74 General Specifications Appendix A ...
Page 99: ...75 Appendix B Dimensions 75 50 176 223 75 Four M4 70 5 16 5 ...
Page 102: ...78 Types of Memory Appendix C ...
Page 107: ...83 Recommended Enabling Circuits Appendix D Program Example ...
Page 108: ...84 Recommended Enabling Circuits Appendix D ...