M12 torque handle
Hole of the M12 attachment
4
Mount the M12 attachment on the M12 screw connector of the IO-Link cable. After you mount
the M12 attachment, rotate the M12 torque handle in the direction shown in the following figure
to tighten the M12 screw connector to the specified torque.
M12 torque handle
M12 attachment
M12 screw connector
Procedure for Disconnecting an IO-Link Cable
Use the following procedures to disconnect an I/O-Link cable. Turn OFF the Unit/input power supply
and output power supply to the IO-Link Master Unit before you remove the IO-Link cable.
1
Insert the M12 torque handle into the tightening hole of the M12 attachment. When you remove
the connector, place the M12 attachment upside down, that is, in the opposite orientation to
that for tightening.
5 Installation and Wiring
5-6
NXR-series IO-Link I/O Hub User’s Manual (W620)
Summary of Contents for NXR Series
Page 6: ...Manual Structure 4 NXR series IO Link I O Hub User s Manual W620 ...
Page 26: ...Revision History 24 NXR series IO Link I O Hub User s Manual W620 ...
Page 34: ...1 Features and System Configuration 1 8 NXR series IO Link I O Hub User s Manual W620 ...
Page 90: ...6 Process Data and Service Data 6 12 NXR series IO Link I O Hub User s Manual W620 ...
Page 108: ...7 Functions of IO Link I O Hubs 7 18 NXR series IO Link I O Hub User s Manual W620 ...
Page 131: ...I Index I 1 NXR series IO Link I O Hub User s Manual W620 I ...
Page 133: ......