BN
50
S / BN
75
S / BN
100
S / BN
150
S / BN
220
S / BN
300
S
2
13
Power supply output group A
Output ON
Time setting
Time setting
Time setting
Time setting
Output OFF
Power supply output group B
Power supply output group C
●
Group control of power supply output
The output receptacles of the the UPS (BN220S/BN300S) are separated into 3 groups: A, B, and C.
•
The output start times for power supply output group B and C are independent of power sup-
ply output group A, so they can be delayed or set to precede the output stop time.
•
The output start/stop time control funtion is available when using the included “PowerAct Pro”
UPS monitoring software, “UPS Power Manager” or “SNMP/Web card”.
•
Output ON/OFF can be controlled with the included UPS monitoring software while the UPS
(BN220S/BN300S) is operating.
•
The delay settings and ON/OFF control described here can be performed independently for
power supply output group B and power supply output group C.
This function can be used to set the startup order of servers, peripheral devices, etc.
The output receptacles can also be forcibly turned ON/OFF remotely.
Connecting a device to the power supply output
(BN220S/BN300S)
(1) Disconnect the AC Input Plugs of all devices you want
to back up such as your PC and modems from a wall
outlet (commercial power).
(2) Connect devices you want to back up to the Power
Supply Output Receptacles of the UPS.
• If you need more output receptacles than those of
the UPS, purchase a plug strip and use it for extra
output receptacles.
PC
Modem or other
peripheral
Wall outlet
(commercial power)
BN220S/BN300S
BN220S/BN300S
Modem or other peripheral