6
.Maintenance and Inspection
50
Write the date you started using the battery on the included battery replacement
date label, and attach it to the front panel.
Also, by using the included UPS monitoring software, possible to keep a record of
usage start date by the software.
7.
Attach the front panel.
Push the top of the front panel towards the main body taking care of the hook at the bottom.
➀
Use a screwdriver to securely tighten (clockwise) the 2 screws at the top of the front panel.
➁
<After replacing the battery when operation was stopped...>
Connect the AC input plug to a wall outlet (commercial power) and turn ON the power switch
of the UPS. When operation starts, the self-diagnostic test is automatically performed. Nor-
mal operation resumes after the 10-second test.
<After replacing the battery during operation...>
If the battery replacement indicator is displayed and the beeper sounds before replacement,
press the beeper stop/test button once to stop the beeper, and hold it for 5 sec. to perform
a self-diagnostic test. The beeper stops and normal operation resumes after the 10-second
test is complete.
1
2
Tighten the 2 screws.
Battery replacement is now complete.