BU
1002
SW / BU
3002
SW
i
Procedure from installation to operation
Start
Installation/connection
Preparation for operation
Maintenance/
inspection
Yes
No
No
Yes
Yes
No
Read “Safety precautions”
Page iii
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 6
Check the operation and
displays Pages 29
Charge the battery
Page 31
Measure the backup time
Page 31
Read “Using the UPS
monitoring software and
contact signal” Page 66
Operate Page 32
Deteriorated
battery?
Fan stopped?
Perform maintenance
and inspection Page 51
Replace the battery
Page 53
Replace the fan
Page 62
Are you
using UPS monitoring
software or contact
signal?
Charge the battery again
Page 31
* Preparation for operation is
complete.