16
2. Installation and connection
●
The UPS has been charged prior to shipment. However, the backup time becomes shorter when
using it for the first time due to spontaneous discharge.
We recommend charging the UPS before using it.
When you connect the AC Input Plug of the UPS to a wall outlet (commercial power), charging the
battery is automatically started and it is fully charged for 8 hours or less.
●
You can perform "2-4 Checking the operation" on page 17 also before charging the battery.
(3) Connect between the UPS and the surge protection circuit.
See also "7. Using the Network Line Surge Protection Function" on page 35
* If you do not use the Network Line Surge Protection Function, this step is not required.
(4) If you use the attached UPS monitoring software or the standard UPS service of Windows NT or Windows
XP/2000 or if you use Contact Signal, connect the connecting cable between the UPS and your PC.
See also "8. Using the UPS monitoring software and Contact Signal" on page 36
* If you do not use the UPS monitoring software and Contact Signal, this step is not required.
(5) When the installation and connection is complete, connect the AC Input Plug of the UPS to a wall outlet
(commercial power).
RS232C信号入出力コネクタ
信号カード
増設
冷却ファン
OUTPUT電源出力AC100V 50/60Hz
最大10A / 700W
接地
回線サージ保護
回線
ハブ側
モデム・TA
パソコン側
バッテリ
増設コネクタ
DC36V/20A
INPUT
AC100V 入力
50/60Hz
15A
LINE/HUB
MODEM・TA
Network Card
AC入力
過電流保護
15A
Use the Grounding Terminal
for grounding connection as
necessary (for example,
when the AC plug does not
provide any grounding
means).
Wall outlet for 3 pins
Wall outlet for 2 pins
Connect it to the Grounding
Terminal of the wall outlet.
Grounding Terminal
PC