14
Basic Operating Procedure
Section 1-4
1-4
Basic Operating Procedure
1-4-1
Overview
The following diagram provides an overview of the installation procedures.
For experienced installation engineers, this may provide sufficient informa-
tion. For others, cross-references are made to various sections of this manual
where more explicit information is given. When reading this manual online,
the flow chart entries provide links to the sections containing detailed informa-
tion.
Mount the PRT1-SCU11 on a DIN-rail,
and wire the Unit.
(See section
2-2-2 Mounting the PRT1-
SCU11
)
Select a Device address using the two
rotary switches on the front of the
PRT1-SCU11
(See section
2-1-3 Switch Settings
)
Select a baud rate to be used on the
RS-422A/RS-485 protocol network.
Disable the auxiliary RS-232C port on
the front.
(See section
2-1-3 Switch Settings
)
Connect the I/O Modules Units to the
RS-422A/RS-485 network, and connect
the PRT1-SCU11 to the PROFIBUS
network (See section
2-3 Wiring the
RS-422A / RS-485 Devices
)
Power up the PRT1-SCU11.
Configure the PROFIBUS Master,
using the Master Configuration tool
(See section
2-6 Configuring the
PROFIBUS DP network
).
The PRT1-SCU11 starts exchanging
I/O data between the RS-422A/RS-485
devices and the PROFIBUS Master.
Status is confirmed by the FCOM and
COMM LED indicators.
(See section
2-1-2 LED Indicators
).
Summary of Contents for PROFIBUS DP GATEWAY
Page 1: ...OPERATION MANUAL PROFIBUS DP Gateway to Host Link Compoway F PRT1 SCU11 Cat No W01E EN 02 ...
Page 2: ...PRT1 SCU11 PROFIBUS DP Gateway Operation Manual Revised September 19 2005 ...
Page 3: ...iv ...
Page 15: ......
Page 31: ......
Page 71: ......
Page 77: ......
Page 81: ......