14
Basic Operating Procedure
Section 1-4
1-4
Basic Operating Procedure
1-4-1
Overview
The following diagram provides an overview of the installation procedures.
For experienced installation engineers, this may provide sufficient informa-
tion. For others, cross-references are made to various sections of this manual
where more explicit information is given. When reading this manual online,
the flow chart entries provide links to the sections containing detailed informa-
tion.
(1)
(2)
(6)
Select a unique Identity number (0 - 99)
for the unit with the two rotary switches
on the front of the unit.
Connect the PROFIBUS-DP Gateway
Unit to the PROFIBUS-DP network.
(7)
Configure the PROFIBUS-DP Gateway
Unit using the master configuration tool.
Start up the PROFIBUS-DP Master
PROFIBUS-DP Gateway Unit starts
communicating, confirmed by the
COMM LED.
(8)
Mount the PROFIBUS-DP Gateway Unit
on a DIN-rail.
(3)
Select a baudrate for Host Link / Compo-
way-F with the DIP-switches on the front
of the Unit.
(4)
Deselect the auxilary RS-232C port with
the DIP-switch on the front of the Unit.
(5)
Connect the modules to the Host Link or
Compoway-F network, connect this net-
work with the PROFIBUS Gateway Unit.