8 Applied Settings
8 - 82
High-function General-purpose Inverter RX2 Series User’s Manual
Take a mechanical interlock for MC3 and MC2. Otherwise, you run the risk of damage to the inverter.
Since the commercial circuit does not operate either when the earth leakage circuit breaker (ELCB)
trips, connect the commercial circuit of another system to MC2 if the backup is required.
Example of timing from INV to the commercial operation
Example of timing from the commercial operation to INV
M
R
S
T
U
V
W
Ai1(10V)
L
FW
RV
CS
COM
AL1
AL0
AL2
THR
MC1
MC3
ELCB
FWY
RVY
CSY
MC2
H
R0
T0
NFB
Sample connection diagram for the commercial switching
operation and timing
ON
ON
MC1
MC2
MC3
FW
CS
ON
ON
ON
Interlock time for MC2 and MC3
(0.5 to 1 s)
Operation
Inverter
Output
frequency
0.5 to 1s
MC1
MC2
MC3
FW
CS
ON
ON
ON
OFF
Interlock time for MC2 and MC3
(0.5 to 1 s)
Inverter
Output
frequency
Operation with the frequency
matching
[bb-51] Retry waiting time
Operation
Summary of Contents for RX - 2
Page 1: ...High function General purpose Inverter RX2 Series User s Manual I620 E1 01 3G3RX2...
Page 54: ...1 Overview 1 22 High function General purpose Inverter RX2 Series User s Manual...
Page 136: ...2 Design 2 82 High function General purpose Inverter RX2 Series User s Manual...
Page 592: ...8 Applied Settings 8 192 High function General purpose Inverter RX2 Series User s Manual...
Page 754: ...11 Options 11 56 High function General purpose Inverter RX2 Series User s Manual...
Page 794: ...12 Troubleshooting 12 40 High function General purpose Inverter RX2 Series User s Manual...
Page 919: ......