53
ZX-T
Operation Manual
Sec
tio
n 4
M
e
a
s
ur
in
g Thic
k
ne
s
s
Section 4
MAIN APPLICATIONS AND SETTING METHODS
Mounting to the Device
■
Connecting Amplifier Units
Connect two Amplifier Units by placing a Calculating Unit between them as shown in
the diagram below.
The calculation result is displayed on (i.e. output to) the CH2 Amplifier Unit. Connect
the CH2 output cable to the external device to enable external control.
Connections, p. 30
The CH1 Amplifier Unit will display (output) the measurement result for the CH1 Sensor Head only.
■
Mounting the Sensor Head to the Inspection Device
Refer to the following diagram and prepare the mounting jigs. Mount the Sensor Heads
facing each other.
Installing Sensor Heads, p. 26
CH1
CH2
Calculation Unit
Mounting jigs
Summary of Contents for ZX-T -
Page 1: ...OPERATION MANUAL Smart Sensors ZX T Series Cat No E346 E1 04 ...
Page 9: ...6 Preface Contents ZX T Operation Manual PREFACE ...
Page 15: ...12 Preface How to Use This Manual ZX T Operation Manual PREFACE ...
Page 16: ...Section 1 FEATURES 13 ZX T Operation Manual Section 1 FEATURES ZX T Features 14 ...
Page 53: ...50 Section 3 Function Transition Charts ZX T Operation Manual Section 3 BASIC OPERATION ...
Page 103: ...100 Section 5 Error Output Function ZX T Operation Manual Section 5 DETAILED SETTINGS ...
Page 113: ...110 Section 6 Initializing Settings Data ZX T Operation Manual Section 6 AUXILIARY FUNCTIONS ...