Installation Instructions EC 2-25 Lift
(Subject to technical alterations! - Status 09/2018)
This is a translation. The German original shall prevail.
Page 7 of 50
3
Commissioning
3.1
Installation
Prior to installation, the intended frame or foundation upon which the elevator machines are
to be installed must always have been calculated and proved adequate.
The frame must be rigid enough to withstand all and any bending and torsional forces that
may occur during operation.
3.1.1
Installation instructions
For installation in position B1, observe the following:
Rope running direction downwards:
Observe the following for this installation variant:
The housing has 5 contact areas.
Ensure that all 5 contact areas lie evenly. None of the contact areas 1-5 may have an air gap
(max. permissible air gap between surface and contact area: 0.05mm).
Non-compliance can cause distortion of and damage to the elevator machine.
Rope running direction horizontal:
When the rope running direction is horizontal, the gear unit must be additionally horizontally
supported using surfaces A-D.
The same as above applies to horizontal support; none of the contact areas A-D may have an air
gap (max. permissible air gap between contact area and support: 0.05mm).