NCP45491PMNGEVB
3
Testing Procedure
The NCP45491PMNGEVB comes fully assembled and
tested. Follow the steps below to verify board operation.
Refer to the schematic and layout diagrams found in
1. Apply power to VBUS inputs
(12 V, 6 V, and 8 V supply).
2. Apply load currents for all channels.
3. Apply 3.3 V VCC power.
4. Ensure that EN is held at 0 V.
5. Apply MUX_SEL signal. (Square wave 50% duty
cycle, 100 kHz or faster, VCC to 0 V)
a. 12 cycles will read out voltage and current data
for all 6 default channels.
b. Continuous cycles on MUX_SEL will read out
bus voltage and current data continuously,
repeating channels 1
6. Observe the following:
a. 1.3 V on BG_REF_OUT
b. 650 mV on CM_REF_IN
c. 170 mV on BS_REF
d. Bus voltages and currents represented on
DIFF_OUTP and DIFF_OUTN with oscilloscope.
PCB Layout
Care must be taken in PCB layout regarding a few specific
nodes for proper operation of the NCP45491. Connections
to the external sense resistor for each channel must be treated
as a 4 wire Kelvin connection. The SH_IN_Nx and the
SH_IN_Px (connected through R1) must connect directly to
the sense resistor leads for each respective channel. These
should also be large traces to avoid error in the shunt current
measurement. See
for the example layout of the
evaluation board.