In order to allow the current and LED strings programming procedure, the
APRGM board, when the system is in power off, must first be plugged into the
three LDM A main board connectors
“P
4
”
“S
1
”
and
“P
5
”
(respectively CN1,
CN2 and CN3 in APRGM).
NCV78763 LDM A REF DES KIT: APRGM – Setup
NCV78763 LDM A
–
APRGM: LED current programming procedure setup
Summary of Contents for NCV78763 LDM A REFERENCE DESIGN KIT
Page 2: ...Confidential 2 29 08 2016 NCV78763 LDM A v1 1 Quick Start Guide KIT OVERVIEW...
Page 6: ...Confidential 6 29 08 2016 NCV78763 LDM A v1 1 Quick Start Guide HW SETUP...
Page 17: ...Confidential 17 29 08 2016 NCV78763 LDM A v1 1 System Overview Design...
Page 20: ...Confidential 20 29 08 2016 NCV78763 LDM A REF DES sub circuit B reverse battery...
Page 21: ...Confidential 21 29 08 2016 NCV78763 LDM A REF DES sub circuit C MCU interface...
Page 22: ...Confidential 22 29 08 2016 NCV78763 LDM A REF DES sub circuit D MCU...
Page 23: ...Confidential 23 29 08 2016 NCV78763 LDM A REF DES sub circuit E NCV78763...
Page 24: ...Confidential 24 29 08 2016 NCV78763 LDM A REF DES PCB top side...
Page 25: ...Confidential 25 29 08 2016 NCV78763 LDM A v1 1 System Overview Measurement Report...
Page 27: ...Confidential 27 29 08 2016 System steady state stability low VBAT 7V...
Page 28: ...Confidential 28 29 08 2016 System steady state stability nom VBAT 13V...
Page 29: ...Confidential 29 29 08 2016 System steady state stability nom VBAT 19V...