SKU 97439
For technical questions, please call 1-800-444-3353.
Page 6
Figure for bar connection (steps 15-19)
15. Find the holes in the Bars (I, J) and
line them up with the holes in the
Poles (G, H).
Secure the Bars (I, J) to the Poles
16.
(G, H) using four Screws (R) per Bar.
The Screws will be threaded directly
through the cloth surrounding the
Bars.
Choose an area for the Greenhouse
17.
that is flat, level and free of debris. If
possible place the Greenhouse in an
area that is sheltered from the wind.
High winds can tear the Greenhouse
loose from the Stakes (N) and could
result in property damage or personal
injury. In case of severe weather,
take the Greenhouse apart.
Examine the area where the Green-
18.
house is to be placed. Make sure
there are no utility lines beneath the
surface that might be damaged by
the Stakes.
Hammer the Stakes (N) into each
19.
corner of the Greenhouse to secure it
to the ground. Use the two remaining
Stakes to secure the door flap.
Maintenance and
serVicinG
Periodically, inspect the general con-
1.
dition of the product. Check for loose
screws cracked or broken parts, and
any other condition that may affect
its safe operation. If any defects are
found have them repaired or the parts
replaced immediately.
C
2.
lean external surfaces of the prod-
uct with clean, moist cloth.