10hp Direct Drive © O.A.S. 2010
18
XVIII. Supplemental Instructions for Magnetic Motor Starters with
Oneida Air Systems Dust Collectors
Please see complete manufacturer instructions for more information.
This supplement is designed to aid Oneida Air Systems customers with frequently asked questions.
Start/Stop
Pushbutton
You must have this product installed by a qualified and licensed electrician.
Improper installation is very dangerous and will void your warranty.
Follow all local & national electrical codes when installing this product.
This starter can be used in single or 3 phase applications. When used in 1 phase it requires a jumper wire that connects T2 and
L3. (See attached wiring diagram.) This “tricks” the overload into thinking it has 3 phase power. This jumper must be installed by a
licensed electrician.
The jumper is not required if you are using 3 phase power.
Important!
The gauge of the Jumper wire must match the gauge of the wire
bringing power to the motor through the Starter.
Remove the blank plate and install the Start / Stop
Pushbutton into the starter cover.
You must mount the Overload Protector to the contactor. The
Overload comes in the small white box. It mounts to the three
terminals at the bottom of the contractor.
See the complete
instructions for more information.
After mounting the overload, connect (2) brown wires marked
95 & 96 to their respective numbered terminals on the over-
load.