4.5 START-UP & COMMISSIONING WORKSHEET
Please read all installation instructions carefully prior to proceeding with these steps. Use the
following worksheet for checking off the commissioning steps and recording measured values.
STEP TEST/MEASUREMENT
S/N:
S/N:
S/N:
S/N:
1.
Meter location:
2.
Confirm pipe size:
3.
Insertion depth
and orientation:
4.
Control system
programming:
5.
Match display
serial number
(S/N) if ordered:
6.
Signal connections
verified:
7.
Supply voltage verified:
8.
Connect power:
The following steps require flow in the pipe. Flow signal readings should be taken while holding the
flow rate constant, if possible. Otherwise, take the various output readings as quickly as possilbe.
9.
Analog or pulse
output(s)
4 - 20 mA signal:
Scaled output interval:
Calculated flow rate:
__________mA
____________
_______SCFM
__________mA
____________
_______SCFM
__________mA
____________
_______SCFM
__________mA
____________
_______SCFM
10.
Flow rate displayed by
control system:
_______SCFM
_______SCFM
_______SCFM
_______SCFM
| sales@mvandc.com | Phone: 877.566.3837 | Fax: 925.407.2903